- Earth provides what no factory makes: raw materials. ↑1.2
- Minerals are slowest of all, since a new mine is the slowest thing to add. ↑2.3
- The land worth most already has power, water, & permits, and no factory makes land, so builders crowd onto the few sites that have them. ↑2.4
Raw materials
Matter no factory has touched yet
- For
- AISoftwarePhysical Factories 2 of 6Mines & refineries, Building sitesScienceEnergy
- Provided by
- Earth
Raw materials are found, not made, and each comes with its own wait. Land waits on power, water on its town's yes, & minerals on a mine, slowest of all. Physical Factories require them, and a factory takes each as it finds it. Earth hears back through their demand and telemetry, on the clock of contracts, procurement cycles, & repricing [1].
Updated
Land
Sites to build on
Builders now buy the power, and the land comes with it. Tract, "a data center land acquisition and development company," buys raw land and lines up its "power, fiber, zoning and entitlements" before the builders arrive [566]. A retired power plant comes with its own. Homer City, "previously the largest coal-burning power plant in Pennsylvania," is being rebuilt to "generate up to 4.5 GW" from gas [567]. Amazon now proposes 39 data centers around it, built over about ten years from December 2026, with power "supported by the 4.5-gigawatt natural gas power generation facility" [568]. So one gas plant is set to power 39 data centers. A builder who buys such land skips the wait for power, so the price of land follows power, not the ground.
Updated
Water
Lakes, rivers, & aquifers to cool with
Water comes with the site, once its town says yes. In Michigan, a township vote has cleared the way for a 1-gigawatt data center that will draw "up to 3.6 million gallons per day" from the Great Lakes Water Authority, which has 706 million gallons a day to spare [569]. The water was there; the site waited on the town's vote.
Updated
Minerals
Ore to mine, like copper
Copper found now comes out of the ground in the 2040s. S&P Global finds that "It takes 17 years, on average, for a new copper mine to go from discovery to production", and projects that "Unless significant adjustments are made," there will be a "supply deficit of 10 million metric tons by 2040" [373]. An average of the mines that opened leaves out the ones still waiting. In a 2024 study supported by the National Mining Association, S&P warned that its own average, of gold, copper, nickel, silver, & zinc mines, "considers only the 127 mines that have come online since 2002", so the US looked fast, at 13 years [377]. Counting the US mines still in development, and assuming each starts producing by 2030, which S&P calls optimistic, it put the US at "almost 29 years on average from first discovery to first production" [377]. Digging it out is a Physical Factory's work, and the mine keeps the slowest clock of any. Until then, the fastest way around it is to need less.
Nickel shows how fast mine output can grow where a state pushes for plants to process the ore at home. Indonesia brought back its ban on exporting nickel ore "beginning in January 2020, 2 years earlier than previously announced", reportedly "to conserve ore for the domestic processing industry" [570], and its mines grew with the plants built to process their ore: in 2021, their output rose by an estimated 30%, "facilitated by the ongoing commissioning of integrated nickel pig iron and stainless-steel projects" [571]. From 2018 to 2024 they went from 606,000 tonnes of nickel to 2,310,000, from a quarter of the world's to 62% [570][572]. Other new plants, which leach the ore with acid, make cobalt as a by-product. Their output "only began in 2021", and by 2025 Indonesia mined 14% of the world's cobalt; where such plants elsewhere were "typically slow to develop and ran over budget", Indonesia's were "established much faster, partly owing to cheap Chinese capital" [264].
Updated