Physical Factories

Where materials are made

MarkdownJSON

Requires
Decisions, Raw materials, Power, Findings, Funding, Labor, Governance
Produces
Refined materials
Feedback
Demand, Telemetry
  1. Physical Factories make the materials every factory is built from. ↑1.1
  2. They learn from demand and telemetry, both hard to read. ↑1.3
  3. Most are still given plans, so their plans change only as fast as people with the process knowledge rewrite them. ↑2.1
  4. Buildings, fabs, equipment, & mines take years to add, so a decision to build waits years to hear back. ↑2.3
  5. Every factory waits on a few machines that take years to get, and AI Factories on a few makers of their chips & equipment. ↑2.4
  6. When the only line that makes a part stops, the factories that need it stop once their stock runs out. ↑2.5

Refined materials

Matter made useful, like chips and buildings

For
AI FactoriesSoftwarePhysicalScience FactoriesEnergy FactoriesCities
Produced by
Physical Factories
Limits
Sourcing desks

Every factory is built from refined materials. Mines and refineries produce the metals and fuel the other plants require, machine plants produce the machines that fill them, and goods plants produce the goods people buy. AI Factories are built from chips, Energy Factories from equipment like turbines & transformers, and Science Factories from the machines that run their experiments.

Of every $100 that flows into the AI buildout, about $50 goes to chips, $42.50 to the equipment that moves their heat, data, & power, & $7.50 to the buildings they stand in [320].

Updated

Chips

Materials that compute

Share
50% of what's spent building AI Factories [320]
For
AI Factories all 4Training clusters, Online training clusters, Inference clusters, AI labsSoftwarePhysical Factories 3 of 6Equipment plants, Machine plants, Goods plantsScienceEnergy
Produced by
Fabs

Chips take half the money [320], and they wait on more than their fabs. The half buys accelerators, memory, & CPUs, plus the work of building servers. Their fabs take years to add, and the chipmakers keep much of the money as margin, so the biggest buyers have started building their own. Memory is short, and a cloth can hold back the servers.

Updated

Accelerators

Chips that run the models' math

Share
25% of what's spent building AI Factories [320]

Accelerators are ordered years ahead, and they're splitting by job. Nvidia and AMD make the GPUs [321][322], and in October 2025 OpenAI agreed to deploy 6 gigawatts of AMD's GPUs "across multiple generations," the first gigawatt "set to begin in the second half of 2026" [322]. It's a commitment: the order comes first, for chips not yet made.

The split follows how a model answers. Reading the prompt is one big batch of math, which "benefits from dense parallel compute and large memory capacity"; writing the reply is "a repeated per-token loop," where speed depends on how fast memory reaches the math [323]. In Nvidia's newest racks, its Rubin GPUs read, and LPUs of Groq's design, each with "500 MB of compiler-managed SRAM" on the chip itself, speed up the writing [323]. Nvidia paid Groq $13.0 billion in the year to January 2026 under a non-exclusive license [324], and the LPU racks went into full production in August 2026, with Groq itself planning to be among the first to use them [325]. So the challenger didn't fork the stack: its chip ships in the GPU maker's rack.

The new makers of accelerators that say where their chips are made name the same foundry. Etched's first silicon "came back from TSMC N4P", its design uses HBM, and in August 2026 it wrote, "We shipped our first rack to Jane Street" [326][327]. Positron's next chip "tapes out on TSMC N3P at the end of 2026, with production in the second half of 2027", and is built on memory "that sidesteps constrained HBM and CoWoS supply chains" [328]. MatX raised "a $500M Series B" in February 2026, "with tapeout in under a year", and names no foundry [329]. So Etched and Positron add designs, not a new place to make them, and of the two that name their memory, only Positron designs around HBM.

Updated

Memory ICs

Chips that hold what accelerators work on

Share
15% of what's spent building AI Factories [320]
Limits
Home data centers

Memory makers can't keep up with AI servers. AI servers use high-bandwidth memory (HBM), DRAM, & flash [330], made by SK hynix, Samsung, & Micron [331][332][333]. In October 2026, SK hynix said it expects "the structure in which demand exceeds supply to persist through 2030", even as it plans to "ramp up M15X to maximum capacity by the end of the year" [334]. Its first Yongin cleanroom was planned for early 2027 [331]. In July 2026, Samsung said "supply constraints are expected to continue" [332]. Meanwhile prices climbed: in the second quarter, DRAM and storage sold for more than twice as much per bit as a year before [330]. The same shortage held back the machines home data centers run on: in April 2026, many Mac mini configurations with more memory took months to ship [304].

Updated

CPUs, other chips, & server production

Chips for the rest of the server, and its assembly

Share
10% of what's spent building AI Factories [320]

Electronics plants assemble the servers, and they can wait on a cloth inside the boards. Nittobo, which TrendForce says holds "approximately 90% market share in T-glass," a high-end glass fiber cloth, "is not expected to bring new capacity online until mid-2027 at the earliest" [335]. One maker of one cloth can hold back the servers.

Updated

Equipment

Materials that move power, data, & heat

Share
42.5% of what's spent building AI Factories [320]
For
AISoftwarePhysical Factories 1 of 6Building sitesScienceEnergy Factories all 7Solar farms, Wind farms, Dams, Coal, oil, & gas plants, Fission plants, Fusion plants, Geothermal plants
Produced by
Equipment plants
Limits
Training clusters, Online training clusters, Inference clusters, AI labs, Building sites, Solar farms, Coal, oil, & gas plants, Fission plants

Equipment turns a building of chips into one computer, and its plants grow at three speeds. Cooling carries off the chips' heat, networking moves their data, & power equipment brings their power, each from its own equipment plants: cooling's plants add capacity in about a year, a laser fab takes about two, and a transformer plant about three.

Updated

Cooling

Equipment that removes the chips' heat

Share
7.5% of what's spent building AI Factories [320]

Cooling's plants grow fastest, even as cooling turns to liquid. Nvidia's GB300 NVL72 rack requires "up to 142 kW," and it "is liquid cooled" [336]. So cooling now runs from each chip to the outdoors: cold plates on the chips, coolant distribution units that pump the loop, chillers and cooling towers that send the heat outside, & the plumbing and air between.

In March 2026, Vertiv said it would expand its plant in Ironton, Ohio, raising capacity for liquid cooling and chilled water systems "by ~45%," with the expansion "expected to be operational in the second quarter of 2027" [337]: about a year, where a fab takes four or five.

Updated

Cold plates

Plates that carry heat off each chip

Share
1.5% of what's spent building AI Factories [320]

Cold plates already ship by the million. Boyd said in September 2025 that it had delivered five million to hyperscalers [338].

Updated

Coolant distribution units

Pumps that move coolant between plates and chillers

Share
2% of what's spent building AI Factories [320]

Updated

Chillers & cooling towers

Units that send the heat outdoors

Share
2.5% of what's spent building AI Factories [320]

Updated

Other cooling

Pipes and fans that carry heat the rest of the way

Share
1.5% of what's spent building AI Factories [320]

Updated

Networking

Equipment that joins chips into one computer

Share
15% of what's spent building AI Factories [320]

Networking joins the chips into one machine, and it waits on a laser few companies make. It takes the chips that send data, the cables that carry it, the switches that route it, & the optical transceivers that turn it into light.

Updated

Network processors

Chips that run network cards and switches

Share
3% of what's spent building AI Factories [320]

Updated

Cabling

Fiber and copper lines that carry the data

Share
2% of what's spent building AI Factories [320]

Updated

Switches

Boxes that route data between servers

Share
4.5% of what's spent building AI Factories [320]

AI clusters now buy more switches than the data center's other networks. In the second quarter of 2026, their switch sales passed the front-end networks' for the first time. Celestica led sales of the Ethernet switches for them, then Nvidia, Arista, & Cisco [339].

Updated

Optical transceivers

Modules that turn electrical signals into light

Share
5.5% of what's spent building AI Factories [320]

A transceiver waits on the laser inside it, which few companies make. "Only a few suppliers are available, such as Lumentum, Coherent (Finisar), Mitsubishi, Sumitomo, and Broadcom" [340], and a laser fab takes about two years to add, even one bought ready-made: Lumentum bought a working fab in North Carolina in March 2026, and "The facility is expected to ramp production in mid-2028" [341]. A shortage like this feeds on itself: "Almost every component used in high-speed transceivers is in short supply now, as double ordering proliferated across the industry" [342]. So part of the queue is the same order placed twice, and the plants hear more demand than there is.

The few makers are doubling their capacity, and the wafers beneath their lasers are scarce too. TrendForce expects the makers of EML and CW-DFB lasers to double their combined monthly capacity "to around 50.7 million units in 2026", while three of them, Lumentum, Broadcom, & Mitsubishi Electric, hold "approximately 72%" of the market for EML lasers [343]. The move to faster transceivers is "generating strong demand for indium phosphide-based lasers and detectors", and "the competitive landscape for high-quality indium phosphide is limited to just a few players", said Morris Young, the CEO of AXT [344], which makes the wafers at "manufacturing facilities in three separate locations in China" [345]. AXT had a backlog "now above $500 million" in October 2026, Young said, up from more than $100 million, the figure it had given before [344]. Tim Bettles, its vice president of business development, said "every customer is on allocation right now", with lead times "out 9-plus months on a lot of this stuff" [344]. Lumentum signed a long-term supply agreement, and AXT "received a prepayment for wafers of $43.5 million", its CFO, Gary Fischer, said [344].

China decides which of AXT's wafers leave the country. Since February 2025, anyone exporting indium phosphide from China has had to apply to its Ministry of Commerce for a license [346]. In October 2026, AXT counted about $90 million it could sell in the fourth quarter, product "for which we either already have a permit to ship or for which a permit is not required", Fischer said, while "shipments within China do not require an export license", Young said [344].

Who owns the few makers can change, and states have a say in that too. On November 2, 2026, Marvell agreed to buy Lumentum, at an implied enterprise value of $115 billion, in a deal "expected to close in the first half of calendar year 2028," subject to "receipt of regulatory approvals" [347]. TrendForce expects the effect on China's own transceiver makers to be "a central consideration in China's regulatory review", since they could lose ground if the merged company were to "restrict competitors' access to critical laser sources" [348].

Updated

Power equipment

Equipment that gets power to the chips

Share
20% of what's spent building AI Factories [320]

Power equipment takes the most money after chips [320], and its plants grow slowest of the three. It buys transformers, switchgear, & backup power, a grid connection or a plant on site, & the routing to each rack; the electricity itself comes from Energy Factories. The transformer shows why: its makers have used up much of their slack, and only one US mill makes its steel.

Updated

Power distribution

Transformers, switchgear, & backup power

Share
6.5% of what's spent building AI Factories [320]
Limits
Equipment plants, Coal, oil, & gas plants

Transformers wait on new plants and on a steel only one US mill makes. For a decade, US makers met more demand by running the plants they had harder: utilization of large power transformer plants rose "from 40% to 78%" between 2011 and 2023 [209]. That leaves less slack to take, so more output means new plants, and a new plant takes about three years. Hitachi Energy plans to start building a transformer plant in Mississippi late in 2026, "with transformer production at the facility scheduled to start in 2029" [349].

And the transformer waits on its steel. Grain-oriented electrical steel "is the single most important input for transformer cores" [209], and Cleveland-Cliffs, which calls its Butler Works "the sole U.S. producer of GOES," expects an expansion that raises its output "by up to 25 percent" to be complete "in early 2028" [350]. So the one US mill that makes it can add at most a quarter more, and not before 2028.

Updated

Grid connection & independent generation

Substations and on-site power plants

Share
10% of what's spent building AI Factories [320]
Limits
Training clusters, Online training clusters, Inference clusters, AI labs, Building sites, Solar farms, Wind farms, Coal, oil, & gas plants

In a busy market, most new data center load has no date to connect yet. Dominion Energy has "assigned energization dates to 25 gigawatts of new data centers between now and 2031" but has "not yet offered future connection dates" for "an additional 45 gigawatts of new data center projects" [351]. The transformers that connect a data center wait on that line: Dominion orders long-lead-time materials only after the data center has a date and signs a construction agreement, which requires deposits for "long-lead-time items such as transformers and switchgear, which must be ordered years in advance" [351].

One planned data center waits on a regulator before it has power at all. Lambda says its $33 billion project in Alabama "will be powered by Alabama Power, pending regulatory approval", "with construction anticipated to take up to five years" [352].

Updated

On-site electrical routing

Busways, cables, & busbars

Share
3.5% of what's spent building AI Factories [320]

Updated

Buildings

Materials that house factories and people

Share
7.5% of what's spent building AI Factories [320]
For
AISoftwarePhysicalScienceEnergy Factories 4 of 7Solar farms, Wind farms, Dams, Geothermal plants
Produced by
Building sites
Limits
Fabs, Machine plants

AI Factories spend the least on their buildings, the data centers that building sites put up [320].

Updated

Data centers

Buildings for chips

Share
7.5% of what's spent building AI Factories [320]
For
AI Factories all 4Training clusters, Online training clusters, Inference clusters, AI labsSoftwarePhysicalScienceEnergy

Most of a data center's money buys its shell, but its land is priced by power. The money for one buys the site, the shell, & what makes the shell usable, and how long one takes to build is a building site's clock.

Updated

Land & site acquisition

The purchase of a data center's site

Share
1% of what's spent building AI Factories [320]

Developers pay for a data center's land by its power. In Cushman & Wakefield's words, "Powered land commands significantly higher prices than non-powered land" [353].

Updated

Building shell & structural works

The building itself, from foundations to roof

Share
4% of what's spent building AI Factories [320]

Updated

Interior fit-out & facilities support

The building's interior systems and finishes

Share
2.5% of what's spent building AI Factories [320]

Updated

Metals

Materials the rest are made from

For
AISoftwarePhysical Factories 5 of 6Fabs, Equipment plants, Machine plants, Building sites, Goods plantsScienceEnergy
Produced by
Mines & refineries
Limits
Equipment plants, Goods plants

The other materials are made from metals, which come from mines & refineries, the slowest Physical Factories to add. One mill's metal can hold back a whole kind of equipment, like the steel in transformers.

Updated

Fuel

Materials that burn or split for power

For
AISoftwarePhysicalScienceEnergy Factories 2 of 7Coal, oil, & gas plants, Fission plants
Produced by
Mines & refineries
Limits
Fusion plants

Fuel is a refined material too, and the kind most advanced reactors need is scarce. "Most advanced reactor designs require HALEU", the Department of Energy says, and "HALEU is not currently available from domestic suppliers" [280]. It is uranium "enriched between 5% and 20% in U-235", and the department estimates that US demand "could reach 50 metric tons per year by 2035" [354]. Until more is made, it hands out what it holds: in its first round, in April 2025, "DOE received HALEU requests from 15 companies", and it chose five [355].

Updated

Machines

Materials that make other materials

For
AISoftwarePhysical Factories 2 of 6Fabs, Goods plantsScience Factories all 2Wet labs, Self-driving labsEnergy
Produced by
Machine plants
Limits
Process labs, Fabs, Machine plants

Updated

Goods

Materials people use

Produced by
Goods plants

Updated

Demand

What buyers order

Provided by
Capital, Cities
Feedback to
Physical Factories, Earth
Limits
Planning offices, Investment committees, Home data centers, Wet labs

Demand is the hardest signal for Physical Factories to read. Gathering feedback from the people who use what's made is, in Christian Keil's view, "the most incompressible step": "A superhuman hardware engineer could design one million new iterations of the Apple Watch and get them manufactured for cheap… but then how can it know what customers actually want?" [96]

So Physical Factories read their demand mostly through money and waiting: commitments, prices, & queues. These arrive within months and reach years ahead, while the factories they call for take years to build. Most of the signal is what buyers have paid for and how long they'll wait, not what anyone wants.

Updated

Commitments

Orders buyers have placed or reserved

Feedback to
Mines & refineries, Fabs, Machine plants, Building sites, Goods plants

Commitments tell Physical Factories what to make years ahead, but some can be cancelled [356]. Behind the buyers stand the spending plans and guarantees in capital.

They arrive fast. Nvidia's supply commitments rose from $279 billion to $390 billion in the quarter to October 2026, "primarily related to the multi-year procurement of memory supply" [357]. And they reach far: where supply is scarcest, buyers pay before anything is made. In fiscal 2026 Micron's memory customers paid it $12.75 billion in cash deposits, and "Nearly all of the deposits are scheduled to be repaid between 2029 and 2031" [274].

But a commitment is softer than it looks. Nvidia's agreements with its suppliers "may be cancelable, rescheduled, or adjustable for our business needs" [356]. A plant built to fill an order is a bet that the order holds.

Updated

Prices

What things sell for

Feedback to
Mines & refineries

Prices show where materials are scarcest. In data centers, memory's price per bit more than doubled in a year, and the US producer price index for power and specialty transformers was 86% higher in September 2026 than in January 2020 [358].

Prices turn within months, much faster than the plants they call for, so they tell a maker what's short long before new capacity could answer. Long contracts damp even that signal: in most of Micron's strategic agreements, prices move only within "minimum and maximum bands" [274].

Updated

Queues

Orders still waiting to be filled

Feedback to
Fabs, Equipment plants

Unmet demand waits in queues, but a queue counts who wants in, not who will get in. In Texas, ERCOT is tracking "approximately 474 GW of Large Loads seeking interconnection, of which ~90% are data centers," up from 56 GW in September 2024: more than eightfold in under two years [359][360]. Announcements count the same way: Bernstein Research "analyzed thousands of planned US data centers and concluded that only about 35% of the announced capacity is likely to become reality", Business Insider reported in October 2026 [361].

Some of it never leaves the line, blocked by towns and states. For the machines, from transformers to lasers, the queue shows up as a lead time, and the lead times run to years.

Updated

Telemetry

What materials report back once in use

Feedback to
Physical Factories, Equipment plants, Building sites, Goods plants, Earth

The physical world is hard to read back. As Christian Keil puts it, "It is exceptionally hard to know precisely what is going on in the real, physical world" [96]. Things vary and wear out, and their data is sparse, costly, & slow. A check can pass while the thing fails. One of Christian Keil's friends buys 45 million chickens a week, and one supplier deep in his chain was injecting its chickens with water, which passed every weight check [96].

The signal comes from three places, each earlier than the last: from materials once they're deployed, from observers outside while they're built, and from simulation before anything is built.

Updated

Telemetry from deployed materials

What installed materials report back

Installed materials report back mostly to their operators, and some failures not at all. While training Llama 3 405B on "up to 16K H100 GPUs," Meta had 466 interruptions in 54 days, 419 of them unexpected, and "Approximately 78% of the unexpected interruptions are attributed to confirmed hardware issues" or suspected ones [362]. Where it's read, it turns fast: "significant manual intervention was required only three times during this period, with the rest of issues handled by automation" [362].

Little of it reaches the plants that made the parts. Nvidia is developing an opt-in service in which a customer's software streams "node-level GPU telemetry data" to Nvidia, to "spot errors and anomalies to identify failing parts early" [363]. So the operator hears back on its own, and the maker only with the customer's say-so.

A maker that runs what it builds hears back itself. K2 Space makes most of its satellites' parts, "including reaction wheels, flight computers, and solar arrays" [364]. After its first large satellite, Gravitas, launched in March 2026, some of its solar array modules made less power than expected; K2 reproduced the fault on the ground, and it was "corrected via a manufacturing process improvement we have rolled into all future modules for our next missions", its CTO, Neel Kunjur, wrote [186]. Its software hears back faster than its line: K2 has updated the satellite "on a near-weekly basis", and its next satellites fly in the first half of 2027 [186].

A robot maker heard back the same way from a customer's line. Figure ran its Figure 02 robots at BMW Group Plant Spartanburg, loading sheet-metal parts onto a welding fixture, and counted three things: cycle time, placement accuracy, & "Number of times a human must pause or reset the robot", with a goal of "zero per shift" [365]. Over "1,250+ hours of runtime", the forearm was "our top hardware failure point at BMW" and "One learning that informed Figure 03 design", its next robot, for which Figure "completely re-architected the wrist electronics" [365]. Figure gives its targets, not how often the robots met them [365].

Some failures leave no trace at all. Meta found that silent data corruptions, errors from chip defects that no check logic catches, "do not leave any record or trace in system logs" [366]. So the trace has to be made, by testing the fleet, and how it is tested sets the clock. Meta's test that runs in production, alongside the work, reached a given coverage "within 15 days"; its test of machines taken out of production needed "around 5 to 6 months" to reach the same [366].

Updated

Observation from outside

What outsiders see of the buildout

Some of the signal comes from watching, and it doesn't wait for anyone to report. Epoch AI reads a data center's power from above: it measures "cooling infrastructure such as chillers and cooling towers to infer the total power capacity of each data center," and its Frontier Data Centers Hub uses "satellite imagery and permitting data to independently verify capacity and construction progress" [142].

Updated

Simulation

What simulators show before anything is built

Simulation gives a signal before anything is made, as good as its match to the world. Until recently, a simulator good enough to train a robot in took "substantial manual effort for every task" [310], and agents have started to build it from the robot's own record. Tutor Intelligence reported in November 2026 that agents built on GPT-6 Astra & Claude Opus 5.5 [310] rebuilt a task of picking Lego bricks in simulation from a few demonstrations by its human operators [310], fitting the simulator's look and physics to their "synchronized images, commands, and measured robot state" [310]. Even so, a score can pass while the match fails. A policy trained there "learned to hold bricks by their studs, exploiting contact behavior that did not transfer to the real gripper" [310]. Scored in the earlier simulator, that policy succeeded 84.5% of the time; once Tutor revised the gripper pads' stiffness, travel, & friction, it succeeded 2.6% of the time [310]. The real robot showed what the scores hid: "Real rollouts expose gaps, like the stud grasp, that no simulated metric revealed" [310]. So the hardware stays, as the check, and Tutor feeds each run on it into the next rebuild [310]. Keil expects the same: "Atoms are likely to stay in the iteration loop forever, but with better sims, atomic assembly can be confirmatory, not experimental" [96].

Two makers of software that flies and drives say testing is what they wait on. Shield AI says its software "delivery has compressed from months to days", but "Software cannot improve through real-world evidence if there are too few opportunities to test it" [367]. Wayve calls behavioral validation "a major deployment bottleneck" [368], and is moving it into a simulator, where "Validation stops scaling with road miles and starts scaling with compute" [369].

A test that many makers share stands in for the world too, and they build to it. On October 22, 1998, the US announced a settlement with seven makers of heavy-duty diesel engines, which had sold 1.3 million engines with devices "which allow an engine to pass the EPA emissions test, but then turn off emission controls during highway driving" [370]. In Europe, authorities approved cars on a laboratory test [371]. When national authorities retested diesel cars after Volkswagen's scandal, "the exhaust emissions on the road of almost all Euro 5 and Euro 6 light-duty diesel vehicles significantly exceeded applicable NOx limits, sometimes by a factor of more than 10" [371]. Then the EU added a test on the road, the RDE, and makers built cars that passed it [371]: by November 2018, by a German auto club's count, "463 diesel fuelled vehicle types of 28 brands met the Euro 6d-temp standard", and the EU's auditors wrote that the new test "has led to a significant reduction of NOx emissions of diesel cars" [371]. They still saw "a risk that manufacturers optimise vehicles for the RDE test" [371]. So the makers met the test where it looked, and a test closer to the world moved them closer to it.

Updated

Mines & refineries

Where metals and fuel are dug up and refined

Decision time
7 to 12 days, until a refinery lifts its copper cathodes [372]
Delivery time
17 years for a new copper mine, discovery to production, on average [373]
More built in
17 years for a new copper mine, discovery to production, on average [373]
Waits on
Permission
Limited by
  1. Approvals [374]
  2. The charter [374]
  3. Impacts [374]
Margin
52% operating, Southern Copper in 2025, up from 49% in 2024 [375]
Requires
Raw materials, Schedules, Recipes, Power, Findings, Funding, Labor, Governance
Produces
Metals, Fuel
Feedback
Prices, Commitments
Class
Class 1

Mines & refineries deliver slowest, since a new mine is the slowest thing to add. Refining can hold back a whole kind of equipment too, as the steel in a transformer's core does.

Mines & refineries hear back on a change in days but wait on permission to add a mine. PT Smelting lifts copper cathodes from its refinery's cells "after 7 and 12 days" [372], and Glencore's Townsville refinery strips its copper from the plates and has it "bundled, strapped, sampled and weighed" [376]. A new copper mine takes 17 years from discovery to production, on average [373]. When ERM reviewed 226 mining projects in pre-production since 2015, permitting was "a contributing factor in 45 percent of delays," ahead of stakeholder opposition (26 percent) and environmental concerns (24 percent) [374]. The work pays: Southern Copper's operating income was $7.0 billion on $13.4 billion of sales in 2025, a 52% margin [375].

Resolution Copper, in Arizona, shows how long permission can take. S&P dates its discovery to 1995 [377]. Congress ordered a land exchange for the mine in 2014, the environmental review came out in June 2025, and a court held the transfer until March 2026, when the United States gave the company title to Oak Flat, federal land near Superior, Arizona [378]. Its lawyers wrote to the Supreme Court, "Oak Flat is now private land" [378]. Resolution Copper then planned about $500 million of work over two years, including "Surface drilling to collect additional resource information", alongside state permits [379]. So 31 years after the ore was found, Resolution Copper was still a project, with more drilling and state permits ahead.

A refinery hears back in days, but how a mine is dug can hear back years later. Kakula, in the Democratic Republic of the Congo, was found in 2016, and the Kamoa-Kakula complex it belongs to began producing copper concentrates in May 2021 [380][381]. Seismic activity there was "first detected on May 18, 2025", and water flooded the mine's deepest workings, on its eastern side [382]. The preliminary findings were that blocks of ore set aside for a second pass "started to yield in a cascading fashion", and they recommended changing the mine plans to "increase pillar widths", the columns of rock left to hold up the roof, and making "changes to the mining sequence" [382]. Ivanhoe withdrew the complex's 2026 target of about 600,000 tonnes of copper, and planned a new mining area "separated from the existing mine workings by a barrier pillar" [382]. By November 2026 Ivanhoe expected about 290,000 tonnes from the complex that year [383]. Kakula's western side was mining again, supplying about half the ore to two of the complex's processing plants, but stoping, which Ivanhoe calls "production mining", on Kakula's eastern side was delayed "from Q4 2027 to late Q1 2028" [383]. So, on the first findings, how Kakula was dug heard back four years after the complex began producing, and part of the answer was to dig somewhere new.

At one quarry, trucks already haul without drivers, among machines that people drive. Heidelberg Materials "has autonomously hauled over two million tons of limestone at its Lake Bridgeport quarry in Texas", in "under eight months", with a system that keeps "safe coordination between autonomous haulers and manned vehicles and equipment", said Pronto, which makes it, in January 2026 [384].

At one copper mine, most haul trucks drive themselves, on a site changed to fit them. Freeport finished converting the haul trucks at its Bagdad mine, in Arizona, to autonomous haulage in 2025: 33 drive themselves, and "7 manned haul trucks" are "primarily operated for mine development and maintenance activities" [385]. To make it work, "A new command center was built to monitor and control the trucks," "roads were widened," and "an isolated autonomous operating zone was created to minimize human interactions with the driverless vehicles", while people still run the shovels that load them [386]. In May 2026 Bagdad still ran "the only autonomous haulage fleet in the company" [387]. Worldwide, GlobalData estimated in November 2025 that autonomous, autonomous-ready, & tele-remote (run from afar) machines were 4.2% of the trucks, surface drills, & underground loaders at work [388]. So the trucks are watched and controlled from a command center, on roads widened for them.

Much of the refining of copper, cobalt, & rare earths is done in one country. China made almost half of the world's refined copper in 2025, 48% [389], and 79% of its refined cobalt [264]; for the rare earths in magnets, "the country represented 91% of global refined output" in 2024 [256]. Building rare earth refining elsewhere can take years: outside China, "the time required to obtain the equipment can often span several years" [256]. Iluka decided in April 2022 to build a rare earth refinery at Eneabba, in Western Australia, and says it "will be commissioned in 2027" [390].

Updated

Fabs

Where chips are made

Decision time
Days to weeks, until end-of-line tests show a recipe's yield [199]
Delivery time
4 to 5 years for a new fab, groundbreaking to first wafers, by Micron's plans [274]
More built in
2 to 5 years from groundbreaking to first output, by Micron's plans: 4 to 5 for its Boise and New York fabs, 2 to 3 for a second Idaho fab and additions in Singapore and Hiroshima [274]
Waits on
Atoms
Limited by
  1. Buildings [274]
  2. Machines [391]
  3. Labor [392]
Margin
51% operating, TSMC in 2025, up from 46% in 2024 [393]
Requires
Metals, Machines, Recipes, Designs, Power, Findings, Funding, Labor, Governance
Produces
Chips
Feedback
Commitments, Queues
Class
Class 1

Agents now speed up the decisions around a fab, but people still hold its process knowledge. "By leveraging Claude, our engineering teams can now bring new chip platforms into production more quickly" [81]. Dan Wang calls process knowledge "the part of production that cannot be written down, because it lives in the hands and heads of workers," and "When American factories close, they take this accumulated knowledge with them" [394]. What no plan carries is also what's scarcest as data for the models that might one day write the plans.

A maker of memory chips learned more from each chip it made than from each chip a rival made, and some of what it learned traveled. Across seven generations of memory chips, from 1974 to 1992, Douglas Irwin and Peter Klenow found that "firms learn three times more from an additional unit of their own cumulative production than from an additional unit of another firm's cumulative production", and that "learning spills over just as much between firms in different countries as between firms within a given country" [395]. What traveled still added up, since the rest of the world had typically made more than three times as many chips as any one firm: "In this sense, spillovers are substantial. Yet, in terms of the marginal incentives of the firm, most of the learning is internalized" [395]. In foundries today, some of it travels through ties firms choose. A 2026 working paper on foundries names "knowledge sharing along global supply chains, the movement of engineers within multinational firms, and foreign direct investment", channels that "operate through market mechanisms rather than anonymous technological spillovers", so "access to frontier knowledge is neither automatic nor guaranteed" [396].

Five companies make the world's leading-edge logic and DRAM chips. In January 2025 the US Commerce Department's CHIPS office counted "all five of the world's leading-edge logic and dynamic random-access memory (DRAM) manufacturers (Intel, Micron, Samsung, SK hynix, and TSMC)", and found that "no other economy in the world has more than two of these companies manufacturing on its shores" [397]. A fab's clocks run fast inside and slow outside, & it waits on its buyers.

Updated

Clocks

How long a fab takes to answer and to build

A fab turns fast inside and slow outside. Inside, a recipe hears back from the fab's yield tests in days or weeks, as Process labs show, and the fab tunes it run by run. A finished wafer takes "about 12 weeks on average," "up to 14-20 weeks for advanced processes," by the Semiconductor Industry Association's 2021 count, and ramping up yields takes "around 24 weeks" [398].

Outside, a new fab takes years. Micron broke ground on its Boise fab in September 2022, began building it in October 2023, and expects its first wafers in mid-2027. It broke ground in New York in January 2026, with first wafers expected in 2030. Additions at sites it already runs go faster: a second Idaho fab, a new fab in its Singapore NAND complex, & a cleanroom project in Hiroshima, all begun in 2026, are due in 2028 [274]. Once the building stands, it waits on its tools and the people who install them. ASML expects its supply for 2027 and 2028 "will not fully meet the demand of our customers" [391], and in 2023 TSMC's chair blamed a delay at its first Arizona fab on "an insufficient amount of skilled workers with those specialized expertise required for equipment installation" [392]. While others wait years for more, the fab that makes the leading chips keeps half of what it sells: TSMC turned 51% of its 2025 revenue into operating income, NT$1.94 trillion of NT$3.81 trillion [393].

Updated

Buyers

Whose orders a fab waits on before it builds

A fab waits on its buyers. When Intel announced its Ohio fabs in January 2022, it said "Production is expected to come online in 2025" [287]. In February 2025 it moved the first to "begin operations between 2030 and 2031" [277], and that July it slowed the work again, "to ensure spending is aligned with market demand" [399].

So a buyer that can't wait builds its own. Tesla, SpaceX, & xAI are building Terafab [400], a chip factory in Grimes County, Texas, with "an initial investment of $16.8 billion" [192]; by November 2026 SpaceX was calling it "the $100B Terafab advanced chip manufacturing project" [401]. SpaceX's CFO says why: "we're very concerned about the supply chain constraints that might exist very soon in the next handful of years" [402]. Owning the plant is meant to make it faster, too: Terafab will put manufacturing, packaging, & testing in one place, and "Bringing these aspects together in one location will enable fast, recursive improvements" [192]. Its buyers are its owners: its chips are for Tesla's Optimus robots and self-driving Cybercabs, and for SpaceX's data centers in orbit [192]. A fab its buyers own waits on no one else's orders.

Updated

Equipment plants

Where equipment is made

Decision time
About 12 months, until a finished transformer is tested at the factory, in DOE's 2014 best case [209]
Delivery time
30 months for a transformer on order; large gas turbines ordered now arrive 2030 to 2032 [209][403][404]
More built in
About 3 years for a new transformer plant, by its makers' latest plans [405][406][349]
Waits on
Atoms
Limited by
  1. Power distribution [209]
  2. Metals [209]
  3. Labor [209]
Margin
14.7% segment EBITDA, GE Vernova's Power segment, which makes its gas turbines, in 2025, up from 12.5% in 2024 [407]
Requires
Metals, Chips, Recipes, Power, Findings, Funding, Labor, Governance
Produces
Equipment
Feedback
Queues, Telemetry
Class
Class 1

Equipment plants deliver in years. A large transformer takes about two and a half years, and a large gas turbine ordered now arrives in the 2030s [209][404][403]. Even the lasers in optical transceivers are short: Nvidia secured capacity at the key makers of EML lasers, "leading to extended lead times beyond 2027 and a worldwide shortage" [340].

Buyers who can't wait pay to shorten the clock, and most of what shortens it adds capacity. Nvidia is investing $2 billion in Lumentum, with "an NVIDIA multibillion purchase commitment and future capacity access rights for advanced laser components" [408], and some buyers build their own chip factory. Some lend to the maker: Singulus, which is to build SpaceX's solar cell lines, borrowed "approximately EUR 22.75 million" from it in October 2026 to repay Triumph, a Chinese customer that was its largest shareholder, debts that "no longer give rise to delivery obligations" [409][194], and SpaceX signed for its first line the next month [193]. Some buy the maker: in July 2026, SpaceX bought Mesh Optical, a Los Angeles startup founded in 2025 to make optical transceivers, for $249 million in its own stock [410][411][412]. Mesh had aimed to make "a thousand units per day" within 2026 [411], and a year at that rate is under 1% of the more than 42 million fast data center modules shipped in 2025 [413]. So buying a maker this young adds little capacity soon. Others route around the wait, by buying sites that are already connected and building power on them [19].

Updated

Transformer plants

Where the grid's voltage changers are built

A transformer waits longest on its parts, which take nearly as long as the whole order. In the first half of 2025, a large power transformer took an average of 30 months from order to receipt, up from 5–16 months in 2010 [209]. Its plant hears back only once it is built and tested, about a year in at best. In a 2014 Department of Energy estimate of the best case, which the National Laboratory of the Rockies carries in its 2026 report, design, materials, & manufacturing "can take 12 months," and "Before leaving the factory, each unit undergoes rigorous testing" [209]. The suppliers the laboratory interviewed said "bottlenecks in specialized parts are the biggest problem": bushings take from "about 80 to 90 weeks" to "up to 130 weeks," against those 30 months for a whole transformer [209]. The report also names the steel in the core, "A primary bottleneck is upstream material supply," and the makers told the laboratory "it is difficult to find and train qualified workers" [209].

Two new US transformer plants are planned to take about three years. Siemens Energy announced its Charlotte plant in February 2024 with its first transformers "set to be manufactured in early 2026", and by August 2025 planned to begin making large power transformers there "by early 2027"; at Hitachi Energy's new plant in Mississippi, "Construction is expected to begin late this year, with transformer production at the facility scheduled to start in 2029" [405][406][349].

Updated

Gas turbine plants

Where power plants' jet engines are built

Power waits on turbines, and the turbines are booked into the 2030s. At the end of September 2026 the three largest makers of large gas turbines, GE Vernova, Siemens Energy, & Mitsubishi Heavy Industries, held firm orders for 166 GW, more than twice the 60–70 GW the world can build in a year [414][415][416][417][418]. Together they hold "more than 75% of the market for gas power in development with a named manufacturer", by Global Energy Monitor's count in January 2026, though two thirds of projects name none [419]. Others sell smaller ones: an Italian maker, Ansaldo Energia, will supply eight mid-sized turbines for a Texas project [418]. In July GE Vernova expected to end 2026 "mostly sold out through '30," and from July to September it "sold multiple slots for 2032 delivery" [420][404]. Mitsubishi said in August that the projects it was discussing with customers "will generally be delivered around 2030 to 2031" [403]. So a large gas turbine ordered now from either arrives in the 2030s.

The wait itself is priced. Buyers hold slot reservations for 97 GW more, some paid for up front, to keep a place in line [414][415][421]. Power that's ready now costs about twice as much: "immediacy commands a premium," and short-duration capacity clears about $40–50 million per MW, against $20–25 million on multi-year deals [19].

A place in line can cost money even when plans change. Swept up by the AI frenzy of 2025, SoftBank's Masayoshi Son "placed reservations for a large chunk of the U.S. market for gas power plant turbines" [422]. By the end of September 2026 a SoftBank subsidiary had paid $9.48 billion to reserve manufacturing capacity and buy power equipment for AI data center projects in the US [423]. It revised its plans, and SoftBank booked a loss of $3.73 billion, $2.85 billion of it "non-refundable advance payments made to secure manufacturing capacity and purchase equipment" [423]. SoftBank's report says only "power generation-related equipment" [423]. The Journal ties the loss to the turbines: "It cost the company billions of dollars in losses" [422]. A maker may be able to give an unused place to another buyer. Siemens Energy, not named as one of SoftBank's suppliers, says that if a project doesn't progress in the agreed time, "we can reallocate the slots to another customer where our contractual rights allow" [424]. So a reservation counts a place held, and not every one becomes a plant.

Updated

Machine plants

Where machines are made

Decision time
About 22 weeks, until an EUV machine clears its tests and ships [425]
Delivery time
Over 1 year from order to delivery, for an EUV machine [425]
More built in
None yet: no other company makes EUV machines, and China targets its own EUV chips from 2028 [425][426]
Waits on
Atoms
Limited by
  1. Machines [427]
  2. Buildings [425]
Margin
35% operating, ASML in 2025, up from 32% in 2024 [427]
Requires
Metals, Chips, Designs, Power, Findings, Funding, Labor, Governance
Produces
Machines
Feedback
Commitments
Class
Class 1

What caps the other factories is a few machines that take years to get. The Superdark Factory sets "some ceiling of raw compute that is determined by energy supply, energy infrastructure, and anchor assets such as lithography tooling" at the bottom of the ecology, and calls that bottom layer "the aggregate ecology's slowest subsystem and is therefore its de facto governance arm" [1]. The energy infrastructure the book names waits on turbines. Among machines, it is lithography machines today, and robots may be next.

Some machines have many makers. The lasers that cut and weld in factories are one: IPG Photonics, which makes them, names nine rivals, from Coherent to Wuhan Raycus, with Trumpf among them, "as well as other smaller competitors", and says "competitive pressures have resulted in price reductions, reduced margins, loss of sales and loss of market share" [428].

Followed far enough, factories that make factories become the Anything Factory: an ecology of factories, each making the others.

Updated

Lithography plants

Where the machines that print chips are built

The lithography tools are few, and booked years out. ASML, which "has an effective monopoly in extreme ultraviolet lithography" [429], shipped 44 of its standard EUV machines in 2025 and expects "roughly 65 systems for 2026," its CFO, Roger Dassen, said in October [430]. It had planned for more: in 2022, "to increase our annual capacity to 90 EUV and 600 DUV systems (2025-2026)" [431]. But in July 2025 its CEO, Christophe Fouquet, couldn't yet count on the next year: "while we still prepare for growth in 2026, we cannot confirm it at this stage" [432]. Now the orders outrun the plan. ASML expects that "our supply as currently planned for both 2027 and 2028 will not fully meet the demand of our customers," and "some customers are expressing an interest in placing orders with us for 2029 and even 2030" [391].

A lithography plant hears back on a machine in about five months but sells years ahead, and its suppliers set how many machines it makes. ASML's EUV cycle, "the period between starting production in ASML's clean rooms and shipping," was "about 22 weeks a few quarters ago," its CFO, Roger Dassen, told reporters in July 2026, and he aims for "15 to 16 weeks" [425]. "EUV machines take more than a year to deliver after an order is placed," and ASML is "close to being fully booked" for them in 2027 [425]. ASML's 2025 annual report named one cap: "The number of lithography systems we are able to produce is limited by the production capacity of one of our key suppliers, Carl Zeiss SMT" [427]. By October 2026, Fouquet said "We do not see ZEISS today as a bottleneck for the capacity expansion we are discussing," and that "the only real challenge we have with the supply chain is to make sure they can ramp," by "30% every year" [430]. As the only company that makes EUV machines, ASML keeps over a third of what it sells: it earned €11.3 billion of operating income on €32.7 billion of sales in 2025, a 35% margin [425][427].

One of those suppliers claims a layer of its own. "TRUMPF is the only company in the world capable of building high-power lasers for EUV lithography", its 2025/26 annual report says, and its EUV business, which "manufactures components for our customer ASML," sold €791 million that year, 9% more than the year before [433]. In September 2026, CRN Asia reported Trumpf's chief technology officer, Berthold Schmidt, as saying it is "tripling its production capacity for EUV laser systems within two years" [434]. In the lasers that cut and weld, the same company is one of many makers [428].

No other company makes EUV machines yet. "ASML is currently the world's only manufacturer of EUV lithography systems", its 2025 annual report says [435], and a Chinese prototype reported in December 2025 "is not yet making chips": China is "targeting production of its own EUV chips beginning in 2028, although other experts have projected 2030 as a more likely date" [426].

Updated

Robot plants

Where the machines with arms are built

Robots may be next to cap factories, and their bodies are the slow part. They already make themselves: FANUC said in 2021 that it "is capable of producing 11,000 robots per month in fully automated factories that use its own robots to make robots, controllers and machine tools" [436]. And robot models are starting to move between bodies, so more of what caps robots is in the bodies. Physical Intelligence collected no laundry data on its two-armed UR5e robot, yet π0.7 folded shirts on it about as well as expert operators folding on it for the first time [437]. The move still costs something: on tasks, or pairs of task and robot, it hadn't seen, π0.7's success rates are "in the 60-80% range," against often more than 90% on tasks it had [437]. The body still turns slower than the model. Generalist had its model running a task on a mobile robot that "did not previously exist" two days after the robot reached its office [438]. In the US, redesigning a body's actuators takes months: "The design-cycle time for actuators right now, for almost anyone in the US, is in the months, because you rely on overseas suppliers to order pretty much everything", says David Hansen, a co-founder of Westmag, which makes motors and actuators, and he asks, "if you can only redesign four times a year, how far can you get?" [439]. One robot maker has moved its motor making into the same factory as its robots. In 2026 Yaskawa "commenced full-scale operation of Robot Factory No. 5 (Kitakyushu, Fukuoka Prefecture), which integrates the production of AC servos and robots" [440]. Its motors had come from another plant in the same city [441]. Now the factory can make 1,500 robots and 20,000 servo motors a month, and a motor takes half as long to make as at the old plant [442]. Yaskawa says that designing and supplying a robot's motors quickly there shortens the time it takes to develop a robot [443]. Training is moving off the bodies too, but testing it isn't. Tutor Intelligence argues that, once agents build the simulator, a deployed robot's "performance scales with simulation timesteps and LLM tokens" [310]. Yet it still tests what the simulator taught on bodies, up to 100 robots at once [310], where failure modes "that would take hours to surface on a single robot appear within minutes" [310].

Robots now improve from their own runs, and people still do the scoring. Physical Intelligence found that learning from a robot's own experience "more than doubles task throughput and roughly halves the task failure rate" on some of its hardest tasks, though the method "relies on human labeling and effort for reward feedback, interventions, and episode resets" [444]. Proving a task takes far longer than doing it once: at Skild, "It took a week to cook the first egg, then two months to make it work reliably" [445]. On one of Generalist's tasks, its newest model "achieves 99% success rates, notably higher than GEN-0 (50%)", though "not all tasks that we have attempted are able to hit these rates" [446].

First-person video of people gives a robot model a head start, and the model still learns each task from people driving the robot. Researchers at Peking University and the PKU-PsiBot Joint Lab pretrained a robot model on 9.6 thousand hours of first-person video of people, 8,049 hours of it from Build AI's Egocentric-100K [447]. Across ten tasks, its average success rose from 30% with no such pretraining to 60% with all of it, and every version was then trained on "187 hours of self-collected teleoperation data" [447]. Whether more video keeps helping depends on the robot data trained beside it. Training on video and robot data together, the labs and companies pooling EgoVerse, a shared dataset, found that "positive scaling emerges only when such aligned data are included as part of training", aligned meaning that "human and robot data share task semantics and scene context" [448].

The bodies are mostly made elsewhere. The majority of robots in the United States "are still imported from Japan and Europe" [449], and whether one made abroad may be sold here is up to the state. They move on motors whose rare-earth magnets "enable precision motion control" [256], and China made 94% of the world's sintered magnets in 2024 [256]. Making magnets anywhere else waits on another factory that makes factories: "there are very few equipment and machinery suppliers outside China, making them much more expensive, and the time required to obtain the equipment can often span several years" [256].

Updated

Building sites

Where buildings go up

Decision time
28 days, until test cylinders show the concrete's strength [450]
Delivery time
1 to 4 years from starting construction to a 1 GW data center [135]
More built in
1 to 4 years from starting construction to a 1 GW data center, by builders' plans [135]
Waits on
Power
Limited by
  1. Grid connection & independent generation [138]
  2. Equipment [138]
  3. Designs [138]
Margin
14% operating, Comfort Systems USA in 2025, up from 11% in 2024 [451]
Requires
Raw materials, Metals, Equipment, Schedules, Power, Findings, Funding, Labor, Governance
Produces
Buildings
Feedback
Commitments, Telemetry
Class
Class 1

A decision to build hears back only once the building stands. A building site is a factory too: drawn around a plot, it refines land into a building. The Superdark Factory, following Herbert Simon, defines each subsystem of a factory "exactly by the band of frequencies at which its internal interactions run," and says its governance "needs to relate itself to the periodicity of the factory's slowest loops" [1]. The bands are far apart. An agent writes a factory's work instructions in minutes, and a model trains in weeks. Physical Factories move in years, at "the comparatively ponderous temporality of materials" [1], and the mines beneath them in decades.

What sets a clock is how long it waits to hear back: "The period of a given factory loop is largely determined by the delay through which feedback is returned" [1]. A decision that orders something hears back only once it arrives, so its clock is the delivery, and a decision to build a plant hears back only once the plant is built. Those are the slowest clocks, and so far people make those decisions.

It happened with electricity. Electrifying factories didn't "have an impact on productivity growth in manufacturing before the early 1920s", Paul David found, "four decades after the first central power station opened for business" [452]. The delay was largely the buildings: replacing "still serviceable manufacturing plants" built for water and steam didn't pay, so the new kind waited for old ones to wear out and for the building boom of the 1920s [452]. Once a motor ran each machine, "Factory structures could be radically redesigned", lighter and on one floor [452]. So the new power reached factories at the pace their buildings were replaced.

A data center takes years to reach a gigawatt, and the fastest skip the wait for the grid. Epoch AI reports that "the time from starting construction to reaching 1 GW of facility power capacity typically ranges from 1 to 4 years" [135]. Stargate's flagship campus in Abilene, Texas, sits inside that range. Crusoe began building it in June 2024, and "Within a year, the first two buildings were energized" [162]. Crusoe expects the full 1.2 GW "to reach completion by the end of 2026" [453]. The fastest planned, xAI's Colossus 2, targets 12 months, by "reusing existing industrial shells and generating its own power early using gas turbines and batteries, before full grid connection" [135]. SpaceX plans one near Starbase, Texas, that stays off the grid: it "will generate its own electricity rather than drawing power from the public grid" [401]. So a building's clock is mostly its power's.

Some new plants come quickly by taking over what others already built or permitted. Hadrian, which makes precision parts for aerospace and defense, leased a building in an industrial project in Mesa, Arizona, in July 2025, and the city reported it "already in production" in January 2026 [454][455]. Peak Energy plans to make grid batteries in Sacramento from early 2027, "a quick turnaround as far as factory buildouts go, made possible because Peak found a newly built shell to lease", whose site "already had power supply" [272]. And Mariana Minerals bought a Utah copper mine with "a roughly 10,000-acre permitted land package" in late 2025, and by its own count "restarted mining operations under autonomous orchestration within 4 months", where a new copper mine takes 17 years from discovery, on average [456][457]. Each skipped a slow part of the clock: the building, its power, or its permit.

The builders are starting to work like factories, but the job isn't shorter yet. Data center developers use robots to fabricate, lay out, & drill, with "~12x per-welder throughput for structural assembly," though "evidence of faster completion of entire facilities remains limited so far" [19]. Some now make the whole building in a plant. Crusoe announced a plant in Colorado in March 2026 to make its Spark data centers: "By treating infrastructure as a manufactured product, Crusoe can deliver these AI-optimized data centers in as little as three months" [458]. The site around them takes longer. In July 2026 Energy Vault said it had begun building one for them in Snyder, Texas, with "fiber installation, site preparation, power infrastructure," and set its first 8 MW for "commercial operation in Q1 2027" [459]. A faster crew, or a building shipped whole, can't move the parts of the clock set beyond the site: power, land, labor, & whether the town says yes.

China builds data centers for less, and its builders rarely go fully modular. SemiAnalysis visited Galaxy, a campus Envision owns in Ulanqab, Inner Mongolia, and reports that "Its first 120MW phase was delivered within a year at a fifth of US costs" [259]. It puts capex, the money spent to build, in China's data center market at "less than $3mm per MW," which "has fallen about 25%" over the past five years [259]. And the sites have hands to spare: "with this much labor available, Chinese datacenters rarely take a fully modular approach, yet construction costs keep falling" [259]. At Abilene, "Within a year, the first two buildings were energized" [162]. SemiAnalysis says of the two campuses that "both were planned around their own power": Envision "builds its own wind farms and a dedicated power line to supply it," and "All four phases are built-to-suit for two internet giants" [259]. So Galaxy's first phase and Abilene's first two buildings each came within a year, and China's costs fell while its builders rarely went fully modular.

And buyers book far ahead, which pulls the clocks apart. Some of Anthropic's power and data center contracts "have initial terms of 20 years," while new models arrive "in months rather than years" [81]. For now, agents shorten the decisions, not the deliveries. A decision shortens a delivery only by changing what it waits for, as a substitute does.

The decisions made on a building site hear back in weeks, but its buildings take years, and what holds them arrives from beyond the site. The National Ready Mixed Concrete Association notes that "In most cases strength requirements for concrete are at an age of 28 days," so a site learns whether its concrete meets the specification four weeks after the pour [450]. In Turner & Townsend's 2026 poll of 400 data center experts, asked for the three biggest challenges to a committed schedule, long lead times drew 234 votes and the availability of power 225, ahead of design changes (196), permitting (165), & skilled labor (156) [138]. Lead times and power nearly tie, and the same report calls access to power "the defining challenge facing the global data centre development sector," so power comes first among its limits [138]. Building them pays a contractor a modest share: Comfort Systems USA earned $1.31 billion of operating income on $9.10 billion of revenue in 2025, a 14% margin [451].

Updated

Goods plants

Where goods are made

Decision time
About 15 hours, until end-of-line tests check the finished car [460]
Delivery time
Under 2 years for a new car plant, groundbreaking to first car [461]
More built in
About 2.5 years for a new car plant, from deal to first car, at Hyundai in Georgia [461]
Waits on
Atoms
Limited by
  1. Metals [462]
  2. The state [462]
Margin
7% operating, Toyota in the year to March 2026, down from 10% in the year to March 2025 [463]
Requires
Metals, Chips, Machines, Designs, Power, Findings, Funding, Labor, Governance
Produces
Goods
Feedback
Commitments, Telemetry
Class
Class 1

People still write the plans for most goods plants, down to each machine's instructions. Even a Class 1 machine waits on a person for its plan: a machinist translates the engineer's CAD file into the instructions that drive a CNC machine, in "an artisanal process" whose "variability leads to errors in translation" [96]. That translation is where agents are starting to write the plans.

Software has started on that translation, and proving it out took months. Hadrian, which makes precision metal parts for aerospace, space, & defense companies, has software that lets it "take legacy designs or CAD files from customers and turn them into digital instructions to make finished parts", Forbes reported in 2024 [464]. To win its first customers' trust, "the startup spent the next nine months making parts on its own dime": "We made probably $1 million worth of parts and destroyed them just to test the systems", said Chris Power, its CEO [464]. Where the plan is for hands, people still write most of it at Senra Systems, which makes wire harnesses: its engineers turn each customer's drawing into work instructions, a step "like 20% automated" in 2026 [465]. "Over time, it can use those human-crafted work instructions to train models that can get to somewhere like 90% of the way from drawing to work instructions, with an engineer doing the final check-off" [465].

A few lines are already past it. In 2024, Xiaomi said its newest production lines were "smart enough to diagnose and fix problems, as well as optimizing its own processes" [1]. Given a goal, they make their own plans, which makes them Class 2, ahead of most goods plants.

A new plant can also start by hand on purpose. As Anduril began building aircraft at its Arsenal-1 plant in March 2026, "We are definitely automation-free to start here", said John Malone, its head of production for autonomous airpower, and Matt Grimm, a co-founder, said its factories are designed "to have as few monuments as possible and to be as flexible as possible" [466].

Goods plants hear back fastest among Physical Factories, in under a day, and add a plant in under two years, and what weighs on them most is the cost of what they buy. At Toyota's plant in Onnaing, France, "it takes 15 hours to produce a Yaris or Yaris Cross," and "At the end of the line, inspection teams perform various static checks and dynamic performance tests" [460]. Hyundai signed its agreement with Georgia in May 2022, and the first car rolled off the line at its Metaplant America on October 3, 2024, "less than two years after breaking ground" [461]. In the National Association of Manufacturers' survey of 220 manufacturers in August 2026, "80.8% of manufacturers cited increased raw material costs as their top business challenge," ahead of healthcare and insurance costs (72.3%) and trade uncertainties [462]. Making goods keeps a thin share: Toyota earned ¥3.77 trillion of operating income on ¥50.68 trillion of sales in the year to March 2026, a 7% margin [463].

Updated

Single sources

Parts that come from one line

In 2021, a fire stopped the one line that made some of the world's car chips, and carmakers felt it for months. On March 19, plating equipment "ignited due to overcurrent" in the N3 Building of Renesas's Naka Factory, in Japan [467]. Renesas had "about a 30% share of the global market for microcontroller unit chips used in cars," and "Two-thirds of production at the affected line is automotive chips" [468]. About two-thirds of the building's products could be made elsewhere, but in a shortage "the situation does not allow for all products to be immediately produced alternatively" [467]. Roman Schorr of Fitch Ratings found "it's certainly striking that so much right now hinges on one factory" [469].

The wait ran past the repairs. "Chip supplies to car makers would stop around the end of April," Renesas said, and it expected carmakers "to feel the impact for a month-and-a-half to two months" [470]. The building was back to "100% of the pre-fire level" on June 24, but its shipments were still "roughly 90%" of theirs at the end of July [471][472].

What a factory keeps on hand decides how long it can wait. Toyota, "which has agreements with some parts suppliers to stockpile chips, has fared better so far," Reuters reported after the fire [468], and in May it said it was "not seeing any major short term impact from the shortage" [473].

A stop spreads as far as there is no second maker, and does the most harm where critical work rests on what failed. After the 2011 earthquake in Japan, the American plants of Japanese firms, which couldn't replace their Japanese parts, "suffered large drops in U.S. output in the months following the shock, roughly one-for-one with the drop in imports," and their car plants fell to "almost 60 percent below trend," while American manufacturing as a whole fell by "roughly a one percentage point" [474]. In July 2024, a faulty update from CrowdStrike "affected 8.5 million Windows devices, or less than one percent of all Windows machines," but it stopped work far past its share, since "the broad economic and societal impacts reflect the use of CrowdStrike by enterprises that run many critical services" [475].

A state can stop a line on purpose, and then, as after a fire, the stock on hand sets how long a factory can wait. In October 2024, China barred every organization and person in China from "engaging in transaction, cooperation and other activities" with Skydio, an American drone maker [476][477]. Skydio still bought its batteries in China. "We have a substantial stock of batteries on hand," its CEO, Adam Bry, wrote to customers, but "we don't expect new sources to come online until the spring of next year", so it was "rationing batteries to one per drone" [477][476]. A state's cut-off can reach its own makers too. In January 2025, the US Treasury put T-Motor, a Chinese maker of drone motors, under its Russia-related sanctions [478][439]. American drone makers "followed the rules and stopped buying" and ran on "some inventory stored up in the meantime." "It wasn't until April or May, when their motor shelves started to go bare, that they began to freak out", and by May 2025 the industry "started thinking urgently about dual-sourcing", as Packy McCormick, an investor in Westmag, which makes drone motors in California, tells it [439].

Where one seller supplies the whole world, the wait runs for years. TerraPower's Natrium reactor needs a metallic HALEU fuel, which in 2022 was "available only from the Russian state-owned enrichment firm TENEX" [479]. Russia's invasion of Ukraine in 2022 made "the only commercial source of HALEU fuel" no longer a viable part of TerraPower's supply chain, its CEO, Chris Levesque, said, and since "there has been no construction started on new fuel enrichment facilities," it expected Natrium at least two years after its 2028 date [480]. It began building in April 2026 and now aims for 2030 to 2031 [479].

Where others still make it, a stop costs money instead. On September 29, 2021, the only US smelter of primary magnesium, in Utah, "declared force majeure on supply contracts, citing equipment failures" [481]. In 2022 a plant in Indiana that makes aluminum can sheet "shut down some capacity in July until September when an alternative source of magnesium was obtained", and the average US price "nearly doubled" from 2021's [481]. Imports more than doubled that year, and by 2025 the price, an estimated $3.20 a pound, was below 2021's $3.53 [482].

The finest chips are made mostly on one island, by one company, and the stops there so far have been short. In 2022, Taiwan held 69% of the world's capacity to make logic chips finer than 10 nanometers, and South Korea held the rest. The United States made none [483]. The US Commerce Department found the country "heavily dependent on a single company" [484], TSMC, for its leading-edge chips. On April 3, 2024, Taiwan had its largest earthquake in 25 years [485]. TSMC's tools were back "more than 70% within the first 10 hours" and "fully recovered by the end of the third day," with "no damage to our critical tools, including all of our EUV lithography tools" [485]. Some wafers in process "had to be scrapped," and TSMC lost about NT$3 billion net of insurance, a tenth of a percent of its revenue that year [485][393]. After a smaller quake in January 2025, it lost NT$5.3 billion but worked to "recover much of the lost production" [393][486]. A short stop can still cost buyers. In 1999, an earthquake shut the Hsinchu Science Park for six days, and "memory-chip prices tripled," by the account of the Semiconductor Industry Association and Boston Consulting Group [487].

A long stop would cost far more, and TSMC's fabs elsewhere are still years from standing in for Taiwan. For a hypothetical year with no Taiwanese foundries at all, the same two groups estimated a "$490 billion drop in revenue" for electronics makers. If the loss were permanent, building enough capacity elsewhere "could take a minimum of three years and $350 billion of investment" [487]. In 2023, Avril Haines, then Director of National Intelligence, told the Senate that if TSMC were blocked, the cost would run "somewhere between $600 billion to over $1 trillion on an annual basis for the first several years," though "we can't provide precision because the scenario will matter" [488]. TSMC's first fab in Arizona has made N4 chips in volume since late 2024, and its second is due to start volume production in the third quarter of 2027 [486][208]. Once its plan there is complete, TSMC says, "around 30% of our 2-nanometer and more advanced capacity will be located in Arizona" [486]. Most new fabs still go to Taiwan: TSMC is building "13 leading edge and advanced packaging fabs in Taiwan over the next several years, and another five to six fabs overseas" [208]. The two groups forecast Taiwan's share of the finest capacity at 47% in 2032 [483].

Updated