- Energy Factories make the power every factory runs on, from the sun, the atom, & the Earth's heat. ↑1.1
- Their solar, wind, hydro, & fission plants hear the price of power fast but wait years to add more, and fusion plants have yet to deliver. ↑2.3
- So governments and utilities keep old coal plants open, since a plant decided now meets load only years on. ↑2.3
Power
Energy ready to use, like electricity and heat
- For
- AI Factories all 4Training clusters, Online training clusters, Inference clusters, AI labsSoftware Factories all 8Dev shops, Engineering studios, Process labs, Planning offices, Sourcing desks, Investment committees, Security operations centers, Home data centersPhysical Factories all 6Mines & refineries, Fabs, Equipment plants, Machine plants, Building sites, Goods plantsScience Factories all 2Wet labs, Self-driving labsEnergy Factories all 7Solar farms, Wind farms, Dams, Coal, oil, & gas plants, Fission plants, Fusion plants, Geothermal plantsCities
- Produced by
- Energy Factories
Every factory and every city runs on power, even the factories that make it. It reaches them as electricity and heat. Getting it to a site waits on a grid connection, and carrying it inside an AI Factory takes power equipment.
Updated
Electricity
Power that moves through wires
- Produced by
- Solar farms, Wind farms, Dams, Coal, oil, & gas plants, Fission plants, Fusion plants, Geothermal plants
Updated
Heat
Power delivered as warmth
- Produced by
- Coal, oil, & gas plants, Geothermal plants
Updated
Load
How much power is being used
- Feedback to
- Energy Factories, Solar farms, Wind farms, Dams, Coal, oil, & gas plants, Fission plants, Fusion plants, Geothermal plants
When load outgrows new plants, old ones stay open. A government now keeps coal plants open with data centers among its reasons, while a new gas plant waits on turbines. Without an order, a utility now plans to run its coal units longer, too. In May 2026 Evergy Missouri Metro moved the planned retirement of its La Cygne 1 coal unit from 2033 to 2038, and of two more coal units "beyond the 20-year planning horizon" [518], citing "rapid load growth" alongside the "slowing of decarbonization and environmental restrictions" [518]. New plants are slow to come: "Options are limited for new generation projects that can be developed and placed into commercial operation prior to 2031" [518]. In deep cold, plants on one grid have failed together. What the power sells for comes back as its price.
Updated
Price of power
What power sells for
- Feedback to
- Energy Factories, Solar farms, Wind farms, Dams, Coal, oil, & gas plants, Fission plants, Fusion plants, Geothermal plants
The price of power answers at the next auction, but the plants it calls for take years. PJM buys capacity, power that plants commit to have ready, for more than 67 million people across 13 states and the District of Columbia [519]. In its auction of July 2024, across most of its footprint, the price jumped from $28.92 to $269.92 a megawatt-day [520]. A year later PJM said supply was "responding to the investment signal": 17 generating units, about 1,100 MW, had withdrawn their retirements, and new generation and uprates came to 2,669 MW, "the first increase in new generation and uprates in the last four auctions." The more than 11,000 MW of new projects and upgrades PJM had drawn were "not impacting this auction" [521].
By July 2026 the price had sat at its cap for three auctions in a row, since the one held in July 2025, $325 a megawatt-day the third time [521][519][522]. The last two were the first in PJM's history to fall short of its reliability requirement across its whole footprint, by 6,623 MW and then 6,831 MW [519][522]. They cleared 774 MW and then 525 MW of new generation and uprates, while data centers added nearly 5,100 MW to the forecast peak for the December auction alone [519][522]. PJM's Stu Bresler said "this auction leaves no doubt that data centers' demand for electricity continues to far outstrip new supply" [519]. So the price stays at its cap, while the plants it calls for wait years on turbines.
Now PJM plans to buy power outside its auction. Its board chose a one-time backstop in July, after two short auctions, since a voluntary plan "would not provide sufficient assurance that capacity equal to the identified near-term shortfall would actually be procured" [523][524]. As PJM refiled it in October, the backstop would fill the shortfall of about 6,800 MW with new supply, paying up to "a MW-weighted average of $555/MW-day" for "up to 15 years", against the auction's cap of $325 [522], and "allocate the costs for that new capacity to the Large Loads that are driving them" [525]. The new plants have until June 1, 2032, to run [524]. A new large load that wants "the same level of firm service as other load" has to bring new capacity of its own; otherwise it takes an interim service that can cut its power when supply runs short [523]. None of it has started: FERC suspended the first filing for five months, and the refiled plan would open on March 1, 2027, with results on May 10 [524][525].
Updated
The sun
Power from the sun, now or long ago
Most of the sun's power is sunlight stored long ago, burned in coal, oil, & gas plants. Solar farms, wind farms, & dams together make a little more than half as much [516][517]. Space data centers go to meet the sunlight where it falls.
Updated
Solar farms
Where sunlight makes electricity
- Share
- 8.7% of the world's electricity in 2025 [516][517]
- Decision time
- 5 minutes, until ERCOT's market answers its offer with a price [526]
- Delivery time
- About 6 years from grid request to power, the US median in 2025 [527]
- More built in
- About 6 years from grid request to commercial operation, the median in LBNL's US sample for 2025 [527]
- Waits on
- Permission
- Limited by
- Margin
- 2% operating, 7C Solarparken in 2025, down from 10% in 2024 [529]
- Requires
- Equipment, Buildings, Schedules, Power, Findings, Funding, Labor, Governance
- Produces
- Electricity
- Feedback
- Load, Price of power
- Class
- Class 1
Solar farms hear the price every five minutes but wait about six years for the grid. On ERCOT's grid in Texas, each plant's offer goes into a dispatch run that returns "Five-minute Awards" and "Five-minute Prices" [526], while the median US solar farm finished in 2025 took about six years, 71 months, from its request to connect to its first power, by Lawrence Berkeley National Laboratory's count [527]. When the lab surveyed developers in 2023, about 71% of solar developers named grid interconnection a top-three cause of delays of six months or more, ahead of supply chain at about 55% and local ordinances or zoning at about 51%, and its limits follow that order [528]. A First Solar panel takes hours to make, against the six years a farm waits for the grid. The company turns a sheet of glass into a working panel in about four hours [530]. It expected to make 13.0 to 13.3 gigawatts of panels in the US in 2026 [531]; at their rated 455 to 550 watts each, that comes to about one panel every 1.1 to 1.3 seconds [532][533]. In Germany the price a solar farm hears falls below zero more often: 7C Solarparken, whose parks are 98.8% solar, wrote them down by €20.2 million in 2025 for more frequent periods of negative power prices, lower expected earnings once feed-in tariffs end, & a higher discount rate, and earned €1.2 million of operating income on €65.7 million of revenue, a 2% margin [529].
Updated
Wind farms
Where wind makes electricity
- Share
- 8.5% of the world's electricity in 2025 [516][517]
- Decision time
- 5 minutes, until ERCOT's market answers its offer with a price [526]
- Delivery time
- About 7 years from grid request to power, the US median in 2025 [527]
- More built in
- About 7 years from grid request to commercial operation, the median in LBNL's US sample for 2025 [527]
- Waits on
- Permission
- Limited by
- Margin
- 12% operating, Ørsted in 2025, up from 9% in 2024 [534]
- Requires
- Equipment, Buildings, Schedules, Power, Findings, Funding, Labor, Governance
- Produces
- Electricity
- Feedback
- Load, Price of power
- Class
- Class 1
Wind farms hear the price every five minutes but wait about seven years for the grid. The median US wind farm finished in 2025 took about seven years, 85 months, from its request to connect to its first power, by Lawrence Berkeley National Laboratory's count, while in ERCOT's market its offers hear back every five minutes, as for Solar farms [527]. In the lab's 2023 survey, about 66% of wind developers named grid interconnection a top-three cause of delays of six months or more, and about 61% each named local ordinances or zoning and community opposition, so its limits run in that order, the last two tied; delays caused by community opposition lasted 14 months on average for wind [528]. Ørsted, which makes about 82% of its power from wind, earned DKK 8.6 billion of operating profit on DKK 73.2 billion of revenue in 2025, a 12% margin after DKK 3.6 billion of impairments [534].
Updated
Dams
Where falling water makes electricity
- Share
- 14% of the world's electricity in 2025 [516][517]
- Decision time
- About a day, until day-ahead prices answer its schedule, hour by hour [535]
- Delivery time
- 5 years just to license power at an existing dam, the US median [535]
- More built in
- About 10 years from decision to first power, for Site C in Canada [536][537]
- Waits on
- Permission
- Limited by
- Margin
- 49% operating, China Yangtze Power in 2025, up from 47% in 2024 [538]
- Requires
- Equipment, Buildings, Schedules, Power, Findings, Funding, Labor, Governance
- Produces
- Electricity
- Feedback
- Load, Price of power
- Class
- Class 1
Dams hear the price a day ahead but wait years for permission to add power. Oak Ridge National Laboratory reads the US fleet's output tracking hourly prices as "the ability of the hydropower fleet to schedule more generation during hours with higher prices," within limits set by a dam's other uses and its environmental rules [535]. Adding power to an existing dam took a median five years just to license, across 59 FERC licenses issued from 2010 to 2025, and a dam the Army Corps owns needs a second federal permit [535]. The license sets the delivery time, and permission binds after it too: 33 such plants with 448 MW hold a federal authorization while two are under construction, and at the start of 2026 eight were waiting on the Army Corps' second permit, five of them already licensed [535]. China Yangtze Power, which runs Three Gorges and five other dams, earned 42.6 billion yuan of operating profit on 86.2 billion yuan of revenue in 2025, a 49% margin [538].
British Columbia's Site C dam took about ten years to first power. British Columbia decided to build it on December 16, 2014, and by October 28, 2024 its first generating unit had come into operation [536][537].
Updated
Coal, oil, & gas plants
Where old sunlight, stored as fuel, makes electricity and heat
- Share
- 57% of the world's electricity in 2025 [516][517]
- Decision time
- 5 minutes, until ERCOT's market answers its offer with a price [526]
- Delivery time
- 3 to 6 years for a large gas turbine ordered in late 2026, the backlog [403][404]
- More built in
- About 3.5 years from grid request to commercial operation, the median gas project in LBNL's US sample for 2025 [527]
- Waits on
- Atoms
- Limited by
- Margin
- 11% operating, Vistra in 2025, down from 24% in 2024 [539]
- Requires
- Fuel, Equipment, Schedules, Power, Findings, Funding, Labor, Governance
- Produces
- Electricity, Heat
- Feedback
- Load, Price of power
- Class
- Class 1
US government orders are keeping coal plants open. Coal alone made 33.0% of the world's electricity in 2025, and gas 21.8% [517], and in the US far less of it closed than planned. Its operators "had planned to retire 8.5 GW of capacity" in 2025, and the power sector retired 2.6 GW, "the least since 2010." The EIA puts much of the gap down to the Department of Energy's emergency orders, "directing several coal plants to temporarily remain available to operate with the goal of ensuring grid reliability" [540]. The order that kept Michigan's J.H. Campbell plant open in August 2025 names AI among its reasons: "The prolific growth of data centers for the development of AI, as well as their immense energy needs, presents a new and unexpected source of load growth" [541]. On September 11, 2026, a federal appeals court concluded that the department "exceeded its statutory authority" with the first Campbell order, of May 2025, and vacated it [542]. The orders went on: the same day, the department ordered that a coal plant in Centralia, Washington, be "available to operate" from September 13, with the same sentence on AI [543]. A new gas plant waits on turbines booked years ahead.
Coal, oil, & gas plants hear the price every five minutes but wait years for a new turbine. In ERCOT's market, like Solar farms, they hear back on their offers every five minutes, while Mitsubishi Heavy Industries says the turbine orders it booked from April to June 2026 are "generally scheduled for delivery between 2028 and 2030" [403], and later orders arrive in the 2030s. Its other long waits are about as long or shorter, so they rank behind the turbine: a US gas plant finished in 2025 took about 41 months from its request to connect to its first power, the median of a small group that includes uprates, and a large power transformer took about 30 months from order to delivery in the first half of 2025 [527][209]. Vistra, whose fleet is 62% gas, earned $1.9 billion of operating income on $17.7 billion of revenue in 2025, an 11% margin that also counts its retail sales [539].
Vistra's new units at a plant already running are due about three years after it decided to build them: it decided in September 2025 to build 860 MW at its Permian Basin plant, which Texas expects to start generating in 2028 [544][545].
Updated
The atom
Power from the atom, split or fused
The atom's power all comes from fission plants, and none yet from fusion plants [516][517].
Updated
Fission plants
Where splitting atoms makes electricity
- Share
- 8.9% of the world's electricity in 2025 [516][517]
- Decision time
- 18 to 24 months, until the next refueling outage [546]
- Delivery time
- 14 to 15 years for Vogtle 3 & 4, from work begun in 2009 [547]
- More built in
- 14 to 15 years for Vogtle 3 & 4, from work begun in 2009 [547]
- Waits on
- Process knowledge
- Limited by
- Margin
- 12% operating, Constellation in 2025, down from 18% in 2024 [549]
- Requires
- Fuel, Equipment, Schedules, Power, Findings, Funding, Labor, Governance
- Produces
- Electricity
- Feedback
- Load, Price of power
- Class
- Class 1
Fission plants hear back only every 18 to 24 months, and a new one waits on know-how the US had lost. US nuclear generators "typically operate at or near maximum capacity," and reactors are "typically refueled every 18 to 24 months," with maintenance done during the same outage [546]. Vogtle 3 & 4, the first US reactors in 35 years to begin construction and reach operation, entered commercial operation in July 2023 and in 2024, 14 to 15 years after work began in 2009, with nuclear construction from 2013 [548][547]. The Department of Energy named rework, late modules, low productivity, & attrition among the causes of Unit 3's slip of about seven years, and summed up why: "Vogtle began construction with an incomplete design, an immature supply chain, and an untrained work force" [548]. Its limits follow that order, which is the department's, not a measure of each one's share, and it judged that "Six of these seven root causes were mostly within project leadership's control and could be avoided effectively in future projects" [548]. Constellation, whose "nuclear fleet is the nation's largest," also serves about 2 million customer accounts, and earned $3.1 billion of operating income on $25.5 billion of revenue in 2025, a 12% margin [549].
The lost know-how is coming back in test reactors, and fast. Under the Department of Energy's Reactor Pilot Program, which "leverages DOE authorization to expeditiously certify and construct first-of-a-kind advanced reactor designs for demonstration," three advanced reactors reached criticality in June 2026, and Aalo Atomics' Aalo-X made four on July 4, one more than a May 2025 executive order asked for [550]. Aalo broke ground in Idaho in August 2025 [551], and its CTO said what had held nuclear back: "The hardest problem in nuclear was never the physics, our country simply forgot how to build" [550]. So a new design now hears back in months, though Aalo-X's was a zero-power test, which makes no electricity.
But going critical hears back only on the physics. Valar Atomics broke ground in Utah on September 17, 2025 [552], and its Ward 250 went critical on June 18, 2026: "Nine months ago, this was an empty site", said Isaiah Taylor, its CEO [553][554]. It is small, about 100 kilowatts of heat, and it "generated its first electricity on July 1", yet "Ward 250 is a research reactor, not a commercial power plant" [555][554]. Radiant chose the longer test. "Going critical alone doesn't generate any meaningful power," it says, so it means to run its Kaleidos for "at least 150 hours of continuous operation at full-power without operator intervention" [556][557]. It shipped the reactor to Idaho in August 2026, and at the end of October, with its safety analysis approved, it was cleared for DOE's readiness review, "the next step before nuclear operations can begin" [557].
Who approves the test sets how soon it comes. In April 2025, Valar said that under the Nuclear Regulatory Commission, "Simply testing a reactor prototype takes five to seven years, at best", and that it would build and test its small test reactor, Ward One, in the Philippines instead [558]. Under DOE's authorization, Ward 250, a reactor of the same size, went from an empty site to critical in nine months [553][554]. Selling power still takes the commission's license, which, for a design DOE has authorized, it now aims to review in about 18 months for the first of a kind and 12 for those that follow [559]. Its chair, Ho Nieh, says of the department, "they're the developer", and "they want to move quicker", while the commission is "here to protect public health and safety for long-term operations" [559].
Updated
Fusion plants
Where fusing atoms will make electricity
- Share
- 0% of the world's electricity in 2025 [516][517]
- Decision time
- A few minutes, until the next shot on a test tokamak [560]
- Delivery time
- None yet; Helion targets 2028 for Orion, its first plant [561]
- More built in
- None yet: no fusion plant has made electricity [561]
- Waits on
- Process knowledge
- Limited by
- Margin
- None of its own: no fusion plant sells power yet [561]
- Requires
- Equipment, Schedules, Power, Findings, Funding, Labor, Governance
- Produces
- Electricity
- Feedback
- Load, Price of power
- Class
- Class 1
Fusion plants learn in minutes on test machines but have yet to deliver power. At the DIII-D tokamak, hosted by General Atomics, a shot holds its plasma for a few seconds, and researchers testing a learning controller there in its FY24 campaign wrote that "we only have a few minutes between experiments" [560]. Helion began building Orion, its first plant, in Malaga, Washington, in July 2025 to supply Microsoft "by 2028," while its Polaris prototype was still "expected to demonstrate the first electricity produced from fusion" [561]. So no one can build more fusion plants yet, since none has made electricity. When the Fusion Industry Association surveyed companies in 2025, the major challenges before 2030 they named most were reaching high enough gain (36 of 42), funding (35), & making their own tritium (27), and that count sets the order of its limits [490]. No fusion plant sells power yet, so there is no margin to measure [561].
Updated
Geothermal plants
Power from hot rock underground
- Share
- about 0.3% [562] of the world's electricity in 2025 [516][517]
- Decision time
- 21 days, until a new well is drilled to depth, Fervo's record [563]
- Delivery time
- 23 months to build the plant for Cape Station's first 33 MW [564]
- More built in
- 2 to 3 years from a production well to a working plant, by Ormat's count [489]
- Waits on
- Process knowledge
- Limited by
- Margin
- 17% operating, Ormat in 2025, down from 20% in 2024 [489]
- Requires
- Equipment, Buildings, Schedules, Power, Findings, Funding, Labor, Governance
- Produces
- Electricity, Heat
- Feedback
- Load, Price of power
- Class
- Class 1
Geothermal plants make less power than the sun or the atom, about 99 TWh in 2024 [562].
Geothermal plants learn a well at a time, in weeks, but grow a resource at a time, in years. Fervo Energy drilled its Sawtooth 7 well to nearly 19,500 feet in "just 21 days spud-to-total-depth," a company record, and it built Cape Station's first 33 MW plant in 23 months [563][564]. Before any plant, Ormat says "it generally takes two to five years from the time we start active exploration of a particular geothermal resource to the time we have resource confirmation through drilling and testing," the longest stage it names, so confirming the heat comes first among its limits [489]. Once the heat is found, it has taken "approximately two to three years from the time we drill a production well until a power plant becomes operational" [489]. Permits come next: 90% of US geothermal resources lie on federal land, where one site "could conceivably trigger the NEPA process six separate times," and in Nevada the GAO found approvals took 1 to 4 years; the industry also lists "high up-front capital costs" among its barriers [565]. Ormat earned $169 million of operating income on $990 million of revenue in 2025, a 17% margin [489].