- Requires
- Intelligence, Power, Findings, Funding, Labor, Governance
- Produces
- Decisions
- Feedback
- Traces, Realized consequences
- Software Factories make decisions for Physical, Science, & Energy Factories and for Cities. ↑1.1
- They learn from traces and realized consequences, and are checked hardest by an attack. ↑1.3
- Their agents have started to rewrite their own harness, the part of a Software Factory that learns fastest. ↑2.1
- They hear back at work and at home within minutes, so what they take over improves fast where someone other than its writer checks it. ↑2.2
- Agents have started on designs and recipes, but barely on schedules, substitutes, or new plants. ↑2.3
- Agents now write tests, judge work, & rebuild simulators that other agents answer to. ↑3.2
- Their boundaries sit outside their agents, below what an agent can rewrite. ↑3.5
Decisions
Choices about what to do
- For
- AISoftwarePhysical FactoriesScience FactoriesEnergy FactoriesCities
- Produced by
- Software Factories
Each kind of decision is made for another factory, or for a person. Software Factories decide for the other factories: objectives, plans, & policies. They decide all of the materials to build, and how to build them, for the Physical Factories that produce the refined materials of AI Factories (e.g. brain of the firm [198]).
Designs of what to make go to Physical Factories, from fabs to goods plants, and to Science Factories' labs. Recipes for how to make it go to fabs, equipment plants, & mines. Schedules of how much, when, & where go to mines, building sites, & power plants. Code is for software, substitutes stand in for what's scarce, plant decisions choose which factories to build, and defenses protect software under attack. Choices are made for a person.
Updated
Code
Decisions written as software
- Produced by
- Dev shops
Updated
Designs
Decisions about what to make
- For
- AISoftwarePhysical Factories 3 of 6Fabs, Machine plants, Goods plantsScience Factories all 2Wet labs, Self-driving labsEnergy
- Produced by
- Engineering studios
- Limits
- Building sites, Fission plants
Updated
Recipes
Decisions about how to make it
- For
- AISoftwarePhysical Factories 3 of 6Mines & refineries, Fabs, Equipment plantsScienceEnergy
- Produced by
- Process labs
Updated
Schedules
Decisions about how much, when, & where
- For
- AISoftwarePhysical Factories 2 of 6Mines & refineries, Building sitesScienceEnergy Factories all 7Solar farms, Wind farms, Dams, Coal, oil, & gas plants, Fission plants, Fusion plants, Geothermal plants
- Produced by
- Planning offices
Updated
Substitutes
Decisions about what to use instead
- Produced by
- Sourcing desks
Updated
Plant decisions
Decisions about which factories to build
- Produced by
- Investment committees
Updated
Defenses
Decisions that protect software from attack
- Produced by
- Security operations centers
Updated
Choices
Decisions made for you
- Produced by
- Home data centers
Updated
Traces
Records decisions leave behind
- Feedback to
- Software Factories, Dev shops, Process labs, Security operations centers
The darkest factories can't see inside themselves, only the traces their decisions leave [1]. Traces are how we see them too, and they become the environments and evals of AI Factories. Physical Factories send traces back too, the fastest in under a second, for fault detection inside a fab [199]: process traces.
A factory keeps its traces as logs, and what they're for is a tension. The book holds that "any observation about the factory's interior" is "useless information, even if that information is perfectly accessible and legible" [1]. Exo, a harness its agent can rewrite, keeps every record anyway: "Existing records cannot be overwritten or deleted", since "An agent cannot repair itself if it cannot execute, nor learn from experience it has lost" [200]. So the logs can't steer a dark factory, but they are what it learns from, and what a harm could be traced back through. The philosopher Reza Negarestani, answering the book, would keep just enough for "a consequential trajectory to be reopened when repair or contestation demands it" [201]. Who will trace a harm back, and who pays once a trace finds someone, are still open (see the charter).
Updated
Process traces
What machines record as they run
A fab learns from its own traces run by run, but only inside a fixed plan. Every tool reports as it runs, and the fab feeds what it reports into the next run. Chipmakers call it run-to-run control: "modifying recipe parameters or the selection of control parameters between runs to improve processing performance" [199]. As in a Class 1 factory, the traces tune how the recipe runs, not what it makes.
Its clock is the run, and the run is shrinking, toward "real-time quality parameter control" [199]. What holds it back is measurement, which costs time, so fabs predict measurements from the tools' own data [199]. Darker plants learn more on their own, given an objective instead of a plan.
Updated
Realized consequences
Effects decisions cause in the world
- Feedback to
- Software Factories, Dev shops, Engineering studios, Planning offices, Sourcing desks, Investment committees, Home data centers
A consequence grades the prediction made before it, and agents predict too high. On 100 SWE-Bench Pro tasks, agents judging a finished patch "predict 73% success for GPT (base rate 35%)," and the other two models' estimates run high too [202]. Worse, an agent can make its own prediction come true: scoring rules reward an honest forecast only "assuming predictions cannot influence outcomes" [203].
So the score that teaches is kept apart from the verdict that decides what ships. An update to GPT-4o in ChatGPT, in April 2025, shows why. It added "an additional reward signal based on user feedback," ChatGPT's thumbs-up and thumbs-down, which with the update's other changes "weakened the influence of our primary reward signal, which had been holding sycophancy in check." One check before launch read the same signal, and "the small number of users who tried the model liked it." OpenAI launched the update, "the wrong call," and began rolling it back three days later, once its consequences were in [204].
A change can pass the checks it was given and still fail in the world. At Grafana Labs, "an AI-generated SQL query" in one engineer's change "worked fine in staging, passed CI, and even got reviewed thoroughly, but in production, it broke the database", having "exhausted database connection pool across all clusters" [205].
Some makers of agents now get paid by a consequence. Sierra, which passed "$400M+ in ARR" in October 2026, says its customers "pay for outcomes, not tokens used": "a loan refinanced, an insurance claim paid, a sale closed, a customer retained" [206]. Cognition is paid by a prediction instead. If Devin, its coding agent, "delivers less engineering value than you're paying for, Cognition will fund your usage up to $10M until it does." But "An agent reviews each completed Devin session" and estimates "how long would a human engineer have taken to produce the same work?" Cognition checked those estimates against what engineers at its customers said, and says they do "not replace measuring ROI" [207]. So the seller's own agent grades the work, by the hours a person would have taken, not by what the work did for the business.
A consequence that teaches can also do harm, so the charter limits what a factory may provoke.
From Physical Factories, consequences come back slower, each on its own clock, out to years for a delivery: yield and quality, and delivery and cost actuals. When a decision tells Physical Factories what to build, its consequences come back as their demand and telemetry, down to how the materials hold up in use, on the slowest clocks of all. And the hardest check of all comes from outside, as an attack.
Updated
Yield and quality
Whether a recipe worked
Yield, the share of what's made that works, is a recipe's verdict, and chipmakers share it only in words. TSMC, for one, says its newest node, N2, "entered a high-volume manufacturing in the fourth quarter of 2025, with good yield" [208]. So the other factories learn whether a recipe worked from a word like "good."
A check can pass while the thing fails, as when one supplier's water-injected chickens passed every weight check, a case telemetry tells. A quality check is a judge, and like the judges in continual learning, it can be hacked.
Updated
Delivery and cost actuals
Whether a plan came true
A plan hears back only when its delivery arrives. A buyer who orders a large power transformer learns two and a half years later whether its plan held [209]. They are realized consequences in the strict sense, whether a plan's date, cost, & quantity came true, and little shortens their clock except a shorter delivery. What can come sooner is warning of a slip, from satellites watching construction.
Updated
Dev shops
Where code is written
- Decision time
- Under an hour, until a user responds to an agent's edit [143]
- Delivery time
- A week to a month from commit to production, for the median respondent in 2024 [210]
- More built in
- 3 to 6 months for a company's own focused center in India, by Zinnov's estimate [211]
- Waits on
- Permission
- Limited by
- Margin
- 9.5% operating, EPAM in 2025, down from 11.5% in 2024 [214]
- Requires
- Tokens, Power, Findings, Funding, Labor, Governance
- Produces
- Code, Harnesses
- Feedback
- Traces, Realized consequences
- Class
- Class 2 (Dark)
A Dev shop hears back from its tests as it works and from its users within the hour. Cursor's coding model goes from collecting users' responses to deploying a model trained on them in what Cursor says "takes about five hours" [143], a lesson that reaches the weights by continual learning. A harness can change faster still, without touching the weights beneath it. A public test its agents are graded on is another matter: on one coding benchmark, it passed more than maintainers said they would merge.
What goes dark is the coding agent, not the compiler. A compiler is given a plan, so it is Class 1; a coding agent is given an objective, so it is Class 2; and a factory that sets its own goals would be Class 3 [1]. Builders today say how the code holds up still needs people, and can't turn this fast; we don't expect that to hold.
A Dev shop hears back from its users within the hour but takes weeks to put its code in front of them, and agents have made people's review its bottleneck. Cursor says that because most interactions are short, "Composer receives user feedback within an hour of suggesting an edit" [143]. DORA, Google's research program on software delivery, surveyed developers in 2024, and the cluster that holds the median respondent took between one week and one month to get a commit into production [210]. Fiona Chen and James Stratton, two Harvard economists, read the work records of 655 firms and found that "after adoption of AI agents, the average time from the code’s review submission to its approval increases by 56.1%", while pull requests opened rose 35.7% [212]. Reviewing with AI hasn't closed the gap yet: by July 2026, 79.1% of the firms had tried AI tools in review, but "only 10.8% of pull requests receive at least one AI-generated comment" [212]. DORA had found in 2019 that respondents whose organization had a formal external approval process were "2.6 times more likely to be low performers" [213]. EPAM, which sells software engineering, made $520 million of operating income on $5.46 billion of revenue in 2025, a margin of 9.5% [214].
Three companies say where the wait went in their own shops, and it wasn't one place: review, one person's attention, & sorting what an agent finds. Cognition merged 659 of its own agent's pull requests in one week of February 2026, "up from 154 in our best week in 2025", and found that "the bottleneck shifted from writing code to reviewing it" [215]. At Lovable, one engineer went from "20-30 merged PRs" in a productive week to "150+", and counts their own attention among the limits: "mental context switching becomes one of the hard limits on overall productivity" [216]. ClickHouse built an agent to check each change after it merges, "because the merge stream had outgrown human review capacity", and found a cost in what the agent turns up: "Producing a plausible bug report is nearly free; triaging one costs an engineer" [217].
Agents write the code, and people review it, where people already built the checks. Stripe merges over 1,300 pull requests a week that are "completely minion-produced, human-reviewed", minions being its coding agents, and what they work against is a battery of tests Stripe already had, "over three million of them" [218]. Cognition says where that stops: "Human review is still necessary, because code quality is not straightforwardly verifiable" [219].
On one large task, Factory found that an agent judging its own work stopped early. Its agent "reproduced 36 percent of the program's behavior", and "It stopped because, by its own assessment, it was done"; with a separate agent checking the work, a run "reached 90 percent behavioral parity" [220]. In Factory's own harness, "agents write most of these changes", and "nothing ships until an engineer reviews and merges it" [221].
At Ramp, where agents account for most merged pull requests, what holds the company back is increasingly its own judgment of what to build. Ramp's coding agent, Inspect, "now accounts for 74% of merged PRs", and Karim Atiyeh, a co-founder, asks what the bottleneck is now: "Increasingly, it's our own judgment: which ideas we act on and what we decide should ship" [222].
Two more companies say what stays with people: the parts that are hard to change later, and the choice of what to build. Clay now aims its people's review "toward high-level review and any aspects that are risky or hard to change later" [223]. Wonderful, which says "we banned manual coding", puts the question left as "what should we build, why this and not that, and what does good actually look like" [224].
One Dev shop says it has taken people's review out. Spawn, which makes a game creation engine, "is ten people", and its founder says "earlier this year we killed PRs" [225]. Its agents "change the live code directly and ship to production hourly", and before a change lands, "helper agents that didn't write it try to break it" [225]. Only what "can't be undone, like sending a payment" goes "through a small set of dumb, hard-coded gates" [225]. By his count Spawn "spent $3.1 million on tokens last month" and shipped "77,000 substantial changes" in 30 days, and over the last year "only 1,055 of our 123,548 changes were reverted, about 0.9%" [225]. That is not every fault, since Spawn fixes a broken change "with a new change on top" [225]. What was left waiting, he says, was "decisions of taste, mostly mine" [225]. So Spawn "turned two years of decisions into principles for each person's taste and built AI judges that apply them" [225]. The judges rule on questions the agents file, not on each change [225]. In their first eight days "the judges have returned more than 11,000: 7,296 decided, 2,213 sent back, 1,863 held for a human" [225].
A company can open its own development center in India in months. Zinnov, which says it has partnered on more than 220 of them, says a focused one "can often be completed within three to six months," and a large one may take six to twelve [211].
Updated
Sentiments now
Builders' doubts that agents' code holds up, for now
Builders say how code holds up can't be left to agents yet, and we don't expect that to last. Dexter Horthy, whose company sells a way to plan and review agents' work, stopped reading his agents' code for a while, until "it was easier to rebuild from scratch than it would be to repair everything that was wrong" [226].
Horthy's reason is feedback, the same thing that sets how fast any factory takes over. It comes down, he says, to "what can we teach the model during RL" [226]. A bad design passes today's tests, and its cost, "the penalty function of bad architecture," is "measured in months and years, it's very hard to train a model on this. Or very expensive" [226].
Hard and expensive is a price, and the factories are already paying it, by packing a verdict that takes months into a test. SWE-CI, from researchers at Sun Yat-sen University and Alibaba, replays real projects' histories, on average "233 days and 71 consecutive commits," and scores an agent on "functional correctness on future modifications," so an agent whose choices pile up debt scores worse each round: "those that accumulate technical debt see progressively declining performance" [227]. On it, "within the same provider family, newer models always achieve higher scores," and the newest gained the most, though most models still break a passing test in at least three tasks out of four [227]. Once a slow verdict has a fast check, it can teach, the way environments and evals carry a lesson into the next model.
Companies that build with agents hold back too. Lovable gave the agents in its product more room and, by late 2024, took it back: "Giving them more freedom made the product less dependable", wrote Anton Osika of Lovable [228]. ClickHouse and Vercel, whose agents write and check code, both keep a person on every merge: "Nothing merges without a human maintainer's approval" [217], and "nothing is merged without approval from a human on the AI SDK team" [229].
Two companies report limits in their own use of agents. LangChain tested review agents against what its own reviewers had caught, and "The strongest runs recover about 30% of the baseline issues" [230]. One team at Temporal, after a migration it did with coding agents, wrote: "We would like to report that these practices made the migration dramatically faster. We cannot support that" [231].
The doubters date their own doubts. Horthy grants that "the scope of and complexity of a thing you can do without caring about the code grows with every new model improvement" [226], and Wes McKinney, who says he has written no code this year, gives his a horizon: "maybe in a year, maybe in eighteen months, maybe in three years, things will change" [232]. A verdict that takes months still comes back many times a decade. Over the century, how code holds up becomes one more thing Software Factories learn, and one more place they go dark.
Updated
Engineering studios
Where products are designed
- Decision time
- Six days, until a board is fabricated and assembled [233]
- Delivery time
- Under a week with AI, where layout by hand was quoted at a quarter [233]
- More built in
- 3 to 6 months, as for a company's own development center in India, by Zinnov's estimate [211]
- Waits on
- Process knowledge
- Limited by
- Labor [233]
- Process labs [234]
- Margin
- 14.5% operating before one-time items, L&T Technology Services in fiscal 2026, down from 15.4% in fiscal 2025 [235]
- Requires
- Tokens, Power, Findings, Funding, Labor, Governance
- Produces
- Designs
- Feedback
- Realized consequences
- Class
- Class 2 (Dark)
Agents reached design first, and what they shorten is the designer's hours. Quilter's AI placed and routed a two-board Linux computer of 843 parts in 27 hours, and one engineer spent 38.5 hours cleaning it up, against 428 hours quoted for laying it out by hand [233]. So 428 hours of a person's work became 38.5, plus about a day of the machine's. The figures are Quilter's own.
Now the person's part is shrinking to short prompts, and the back-and-forth with the factory is going. Anthropic gave Claude Fable 5.2 a short prompt for each of three devices, and Claude wrote their specifications, placed and routed their circuit boards, designed their enclosures, and wrote their firmware, while Diode's prompts were "limited to short directives" [236]. "Each board was ready for manufacturing in under a day, with minimal human input" [2], and Diode, which makes circuit boards, "manufactured all three boards directly from Claude's design files, without any back-and-forth over adjustments" [236]. Diode's engineers still built and tested them, under Claude's direction, since "Claude wasn't connected to test equipment or to the machines that make and assemble circuit boards," and the three are prototypes that "haven't been through electrical validation, antenna tuning, thermal testing, or certification" [236]. The figures are Anthropic's own, for three small devices.
An antenna designed by a computer flew two decades earlier. For NASA's Space Technology 5 mission, two evolutionary algorithms designed an X-band antenna, and the best design from each was built [237]. A contractor had designed a quadrifilar helix by conventional practice, and the evolved antenna "required approximately three person-months to design and fabricate whereas the conventional antenna required approximately five months" [238]. When the mission's requirements changed, "within one month of this change, two new antennas were designed and prototypes of the antennas were built and tested" [237]. One of them flew on the mission's three satellites, launched on March 22, 2006, among "the first computer-evolved hardware in outer space" [237]. In a 2025 prototype, a language model writes the simulation, too. LADS, from the University of Glasgow and two other universities, builds an antenna's model in a simulator from a paper's text and pictures, then sets up and runs an optimizer. In the one antenna the paper optimizes, the optimizer reached the best design after "721 EM simulations using about 12 hours", each taking "about 50 seconds" [239]. The paper gives no time for the modeling, and its authors say only that, depending on the engineer's experience, modeling and optimizing a complex antenna "could take from dozens of hours to days" [239]. An engineer still chose two of the ten solutions it gave, and the paper reports only simulated results [239].
Chips are further along, and more disputed. Google DeepMind says AlphaChip's layouts have been "used in every generation of Google's TPU since its publication in 2020" [240]; a meta-analysis in Communications of the ACM finds that Google's method "lags behind human chip designers" [241]. The maker counts its use, the critics its quality, and the two point opposite ways.
Mechanical design is further behind, and a check that grades shape alone can score a part that won't bolt on as near perfect. On Markov's test of modeling 73 real machines in SolidWorks from their drawings, "No model completes a single machine", and "A part that looks right on the screen often fails face by face" [242]. The CAD tests on frontier models' system cards "score a model's CAD by comparing its shape with a ground truth reference", and Normal notes that a bolt hole moved 2 mm barely changes a part's shape, though "the part no longer bolts to the next part" [243]. With the hole moved 4 mm, the shape part of Normal's own score was still 0.985, while its full score, which also checks the space where the bolt must go, "falls to 0.944 at 4 mm, so the part fails" [243].
Either way, a design is only a plan. It still has to be checked against the factory and built, which is how to make it.
With AI laying out the board, a design now reaches the factory about as fast as the factory answers it: under a week each way. Quilter says one engineer "designed a working computer with Quilter's physics-driven AI in less than a week," where "Manual layout of the same system was quoted at a full quarter of work," and the fab built its baseboard on "a standard 3-day fab and 3-day assembly schedule" [233]. What's left slow is people's know-how, so labor ranks first: an engineer's cleanup set the design's time, and the fab's reviewers still checked it by hand before it was built, as how to make it tells [233][234]. These are Quilter's own figures, for one computer. L&T Technology Services, which sells engineering design services, made ₹15,898 million of operating income before one-time items on ₹109,959 million of revenue in its year to March 2026, a margin of 14.5% [235].
Engineering studios borrow the time Zinnov gives under Dev shops for a company's own center in India, a kind of center it calls "ideal for strategic functions such as engineering, AI, cybersecurity, and product development" [211].
Updated
Process labs
Where recipes are worked out
- Decision time
- Days to weeks, until end-of-line tests show a recipe's yield [199]
- Delivery time
- Three to six months to program the automation for one station [244]
- More built in
- About 3 years for BASF's new catalyst development center, 2021 to 2024 [245][246]
- Waits on
- Process knowledge
- Limited by
- Margin
- 22.1% segment profit, Honeywell's UOP in 2025, down from 23.3% in 2024 [247]
- Requires
- Tokens, Power, Findings, Funding, Labor, Governance
- Produces
- Recipes
- Feedback
- Traces
- Class
- Class 2 (Dark)
- Limits
- Engineering studios
A recipe is harder to work out than a design, because it has to meet the real world. Christian Keil, a partner at a16z, says pure design "can largely stay within a machine," while design for manufacturing "requires significantly more interaction with the real world" [96]. Quilter's computer shows where the two meet. At the fab that built it, turning a design into a machine's program is "where the fab converts your design files into machine programs, and where a human reviewer reads your data the way the factory will." Its reviewers raised 58 findings, none from the AI's layout, say the authors, from Quilter and the fab [234]. The AI's part held up; the step that checked it against the factory was still a person's craft.
Agents are starting where the plan is a document. On the assembly line, Arda's agent works out the assembly order, the instructions, & the stations "from the product's CAD files and other design artifacts, so a design change reaches the factory floor without halting production," and at Anduril, basic work instructions "that once took 10 hours can now be created in 15 minutes" [244]. Once a recipe runs, it hears back run by run, through process traces.
What stays slow is teaching the machines. "Programming conventional automation for a single station can take three to six months and cost close to $1 million," and Arda's next step, in prototype, is "using AI agents to program robots to carry out its assembly plans, station by station" [244]. Until that works, an agent writes the plan in minutes and the line waits months for its robots.
A recipe hears back from its yield in days or weeks, and a Process lab then waits months to teach it to a machine. The industry's roadmap, the IRDS, says the delay between processing and "the end-of-line e-test and yield analysis" "can often be days or even weeks," and wants a fab's predictions to arrive "before the next wafer or lot is processed (i.e., seconds or minutes)" [199]. Programming a single station takes months where a person learns the same instructions in a day, as Arda's figures above show, so the machines are its first limit [244]. Some companies do sell recipes to other plants: Honeywell's UOP "delivers licensed process technology, equipment, engineering, catalysts, adsorbents, and services," and the whole business made $692 million of segment profit on $3,134 million of sales in 2025, a margin of 22.1% by a measure that leaves out the amortization of acquired intangibles and some other costs [247].
BASF's new process lab took about three years. BASF announced a pilot plant center in 2021 to "transfer laboratory recipes to production scale more quickly", opened it on December 12, 2024, and says it "constructed the new Center within three years to replace an older building" [245][246].
Updated
Planning offices
Where schedules are set
- Decision time
- Under a day, until the plant replans its schedule [248]
- Delivery time
- Minutes for a new schedule, where meetings once took hours, in one pilot [248]
- More built in
- About 9.5 months to put in a planning platform, in 2024, by Nucleus Research [249]
- Waits on
- Process knowledge
- Limited by
- Margin
- Not reported apart: Genpact sells planning inside its industry segments [251]
- Requires
- Tokens, Power, Findings, Funding, Labor, Governance
- Produces
- Schedules
- Feedback
- Realized consequences
- Class
- Class 2 (Dark)
Plans reach years ahead, but agents have barely started on them, only on the paperwork and the week's schedule. What a plan buys is slow to arrive: buyers commit money and hold places in line years before delivery, as commitments show. Where to build follows power, so builders buy sites that are already connected.
Didero "sits on top of a company's existing ERP," reads what comes in, and "automatically executes the necessary updates and tasks," in TechCrunch's words [252]. A beverage maker was "replanning schedules 10 to 15 times per week, relying on manual meetings," and at one of its plants Sight Machine and Microsoft piloted a small model that turns live plant data and requests in plain words into a problem a solver can optimize [248][253]. Its answers came back "usually within 30 to 90 seconds" [253]. The model states the problem; the solver picks the schedule.
So far the gain is the plan's. Microsoft's chart compares the two schedules, "from 29.7 hours in the original schedule to 5.9 hours in the optimized schedule" of non-productive time a week [253], and neither of Microsoft's stories says how the plant measured whether the plan came true. And for orders, a faster decision matters less than an earlier one: an order placed in one quarter is filled years later, and there the evidence of agents is thin so far. A faster order arrives no sooner; a different one can, by needing less of what's slow.
A Planning office now writes a schedule faster than the floor overturns it, so what limits it is less the writing than the demand it plans for. Sight Machine's Kurt DeMaagd says replanning the bottler's schedule "could take hours and involve a large group of people. Now it can happen in minutes," where it once waited on "decades of scheduling expertise that lived in people's heads" [248]. In BCG's survey of more than 180 planning leaders, late in 2025, demand topped their challenges: 70% put demand volatility among their top three from outside, and 78% forecast inaccuracy among those inside [250]. Some firms plan for others, like Genpact, which sells "supply chain planning and management," but it reports its results by industry and by service line, not by planning, so what this factory earns isn't reported apart [251].
By 2024, a company could put in a supply chain planning platform in under a year, on average. Nucleus Research says implementations that once took "around a year and a half or more" took "an average of nine and a half months" in its 2024 conversations with users [249].
Updated
Sourcing desks
Where substitutes are found
- Decision time
- Months to a year, until a substitute part is approved [254]
- Delivery time
- 55 days for an on-site fuel cell system, by Bloom's count [255]
- More built in
- 55 days for an on-site fuel cell system, by Bloom's count [255]
- Waits on
- Atoms
- Limited by
- Margin
- Not reported apart: Genpact sells sourcing across its industry segments [251]
- Requires
- Tokens, Power, Findings, Funding, Labor, Governance
- Produces
- Substitutes
- Feedback
- Realized consequences
- Class
- Class 2 (Dark)
Agents have barely started on substitutes, the fastest way around a slow material. A substitute is a decision to need less of it: it still waits on its own product, but not on a new mine or a grid connection, so it can arrive years sooner. Power shows it best. Where a grid connection takes years, Bloom says it "delivered a fully operational fuel cell system to Oracle in just 55 days" [255]. Copper can be saved with voltage: at 54 volts, "a single 1 MW rack requires up to 200 kg of copper busbar," so Nvidia plans to move to 800 volts "starting in 2027" [257], long before a new copper mine could open. Envision says it is there already: in November 2026 it said an 800 volt system "is now powering live computing workloads" at its Galaxy campus in Inner Mongolia, and that the architecture brings "reduced cabling and copper requirements" [258]. SemiAnalysis, visiting in September, "saw the 800V system at work" in "one 5MW hall," which it calls a pilot [259]. The savings are the companies' own claims.
Training could make the same decision. A frontier pretraining run expects one big cluster, so it waits for one big grid connection, while small sites don't: "A site under 20 MW often plugs into the grid that's already there" [197]. Core Automation trained one model on two clusters of 160 GPUs each, "roughly 9,000 miles apart," over a 25 Gbps link, and at the same compute it did slightly better than standard training, at "about 1% lower bits per byte" [197]. That is the company's own test, with a fiftieth of the GPUs Microsoft AI trained MAI-Base-2 on [134]. Researchers who trained a small model across three supercomputers on two continents did worse, a perplexity of 34.7 against 28.2 in one place, and call it "operational rather than competitive" [260]. If the first result holds at frontier scale, training could use grid connections already built instead of waiting for a new one.
A country can make the same decision, and Japan's shows it holding for a decade. After China's export controls in 2010, Japan set policies "in close co-ordination with industry," and its total rare earth demand is 30% below its 2010 level, by the IEA's count [256]. Each substitute changes what the factory waits for, instead of waiting faster.
Battery makers have made the same decision about cobalt and nickel, for over half of the batteries put into electric vehicles in 2025 [261]. Lithium iron phosphate (LFP) "uses no nickel or cobalt, which helps hold down costs", as Ford puts it [262]. By GGII's count, in CATL's prospectus, LFP went from 17.6% of the world's EV battery shipments in 2020 to 43.8% in 2024 [263], and by the IEA's count of batteries in new electric vehicles, it was "over 55% of EV batteries deployed globally" in 2025, "up from nearly 50% in 2024" [261]. So when cobalt's price "doubled over the past year, principally following" the Democratic Republic of the Congo's temporary export ban, the IEA found in May 2026 that its effect on battery costs was "far more limited today than in the past", since high-nickel batteries use little cobalt and LFP batteries "contain none" [261]. Demand for cobalt still grew: in 2025, "EV-related cobalt demand rose by 25% y-o-y to 113kt, supported by rising global battery production" [264].
Outside China, the decision mostly runs on China's factories, and where tariffs and sourcing rules hold their batteries back, it waits for new ones. In the European Union, LFP was more than 10% of EV battery demand in 2025, and "Nearly all of these batteries were imported from China"; in the United States, its share "almost halved in 2025 from an already low base in 2024", which the IEA ties to "higher tariffs on Chinese imports and more stringent sourcing requirements" [261]. New plants there still lean on China: "Production of LFP cathode materials and their precursors is still almost entirely concentrated in China" [261]. Ford, which turned to CATL for a technology "ready to manufacture at scale", sent its first LFP cells from its Michigan plant "to power Ford Fathom prototypes" in November 2026 [262]. Sodium-ion cells, a different substitute, "do not require lithium and graphite", though the chemistries "closest to commercial deployment rely on other critical minerals, such as nickel and manganese", and "Nearly all existing global sodium‑ion manufacturing capacity is located in China" [265]. Natron, a US maker of them, ceased operations in September 2025; it "had $25 million worth of orders lined up for its Michigan factory, but it couldn’t deliver them until it had UL certification", TechCrunch wrote, citing Raleigh's News & Observer, and its investors "balked at releasing more funds" [266].
In motors, a design without rare earths went into production in 2020, years before newer designs and magnets without them [267]. BMW said in 2019 that the motor of its iX3 used "a construction method that eliminates the need for rare earth materials" [268], and the iX3's production began in Shenyang on 29 September 2020 [267]. Tesla's Colin Campbell said in March 2023, "We have designed our next drive unit, which uses a permanent-magnet motor, to not use any rare-earth elements at all" [269]. In September 2026, after Elon Musk said the Cybercab's new motor uses no rare earths, Electrek wrote that it "could be a realization of Tesla’s non-rare-earth-magnet effort", and "So far, we’ve only seen this motor in the Cybercab" [270]. Niron Magnetics, which makes magnets of iron nitride, has a Minneapolis facility with "a production capacity of over 5 tons a year", and plans the "first phase coming on board in 2027 and the full plant by 2028" at Sartell, Minnesota, to make 1,500 tons a year [271].
A substitute arrives sooner than it's proven, and what a Sourcing desk waits on most is the making of the substitute itself. Bloom's fuel cells ran for Oracle in 55 days, by Bloom's count [255]. Automakers replacing Nexperia's chips face testing that, an investor told Reuters in November 2025, "can add months," and for Hella, one person in the auto-supply industry said, "testing and approvals could take up to a year" [254]. The IEA calls magnet production "the main bottleneck for supply diversification" [256], so the substitute's own production ranks first and its approval second. Peak Energy makes sodium-ion batteries, a substitute for "the dominant lithium-ion chemistries," yet so far "the company has worked with manufacturers in China to supply cells to its specifications", and its new plant in Sacramento "won't be doing the highly technical cell fabrication" [272]. Some firms source for others, like Genpact, which sells "strategic sourcing" and "category management," but it reports its results by industry and by service line, not by sourcing, so what this factory earns isn't reported apart [251].
Updated
Investment committees
Where new factories get the go-ahead
- Decision time
- About 21 months, until federal review answers a plant's application, for Micron in New York [273]
- Delivery time
- About 5 years from a fab decision to its first wafers, by Micron's plans [274]
- More built in
- Under 2 years from raising a new fund to its sixth investment, at CIP [275][276]
- Waits on
- Permission
- Limited by
- Margin
- 28.3% operating, Copenhagen Infrastructure Partners in 2025, down from 35.5% in 2024 [278]
- Requires
- Tokens, Power, Findings, Funding, Labor, Governance
- Produces
- Plant decisions
- Feedback
- Realized consequences
- Class
- Class 2 (Dark)
Deciding which factories to build is the slowest decision, and so far people make every one. No public case yet shows an agent deciding to build a factory. Still, this factory is Class 2: a committee isn't given a plan, but an objective, the return its fund has to earn, and it makes its own plans to meet it. So what it will choose can't be read from any plan it's handed, and in the book's sense it is already dark. What hasn't happened is the takeover: no agent yet makes this decision in people's place.
Makers add capacity as buyers commit, and buyers pay for capacity themselves when they can't wait, down to their own chip factory, on the clocks of fabs and turbines. Memory makers wait for the commitment because they remember the busts, says Sam Altman, OpenAI's CEO and one of their buyers: "they all remember their history. How many times they almost went bankrupt by making too many fabs." So, in his view, high prices aren't yet bringing new supply: "I think the invisible hand is failing right now" [21]. The caution is a lesson the makers learned by nearly dying. And a buyer's commitment is hard to take back: most of what one lab has committed for its compute must be paid whatever it earns. Whether a plant can be built and staffed is up to the state and the labor it can find.
A state is a buyer too, and when a slow thing has too few makers, it pays for new ones. In January 2026, the Department of Energy awarded American Centrifuge Operating and General Matter $900 million each "to create domestic HALEU enrichment capacity", for the fuel most advanced reactors need, to be paid "under a strict milestone approach" [279][280]. General Matter, "founded in January 2024", plans to enrich at Paducah, Kentucky, "by the end of the decade" [281][282]. New makers come late, and cost more. In March 2018 the Navy gave its new landing craft to one small yard, Swiftships; the first three, due in 2023, were "still incomplete", and in February 2024 the Navy moved to end the contract [283]. A second yard, Austal USA, which had begun a steel line "following a $50 million Defense Production Act grant in 2020", won a contract in September 2023 at "a significantly higher per-unit cost than Swiftships' contract" [283]. It delivered the first craft in August 2026, eight years after the first award, on a contract that is "loss-making" for it [284][285]. A month later the Navy hired three more yards, "building a resilient 'second source' of supply for landing craft" [284].
The analysis an investment committee reads now has a test, and the best agents meet about half of it. Coding agents are graded by whether their code passes tests, but "Finance has no similar test suite," so Julius Research, an AI lab, had private equity and investment banking professionals write one: 21 tasks, averaging 27 hours of an analyst's work and 84 criteria apiece, graded from whether the numbers are right to whether the evidence supports the assumptions [286]. The best agents met about 55% of the criteria [286]. What they miss is the judgment. In most tasks, agents are "able to find the relevant information without recognizing its implications," and have "difficulty challenging a supplied assumption or evaluating better opportunities unless strictly told to" [286]. In one acquisition, moving the closing date would have lowered the required offer by $1.25 million, and "All attempts by frontier models missed this saving, even though several had identified the buyer's right to choose the date" [286]. That judgment is the committee's own work, and it's what models miss in AI labs too.
A plant decision first hears back from the state, after about 21 months for Micron in New York, and is delivered only when the plant first produces, about five years on for a fab, as Fabs show; demand moves that date by years. In New York, the Army Corps opened the federal environmental review of Micron's site on March 5, 2024, Commerce recorded its decision in December 2025, about 21 months later, and the record says "Micron will not be authorized to begin construction" until the requirements of its historic preservation agreement are met [273]; Micron broke ground the next month [274]. Intel, which expected its first Ohio fab to produce in 2025, said in February 2025 it would "begin operations between 2030 and 2031," to "align the start of production of our fabs with the needs of our business and broader market demand" [287][277]. Some firms do decide for others: Copenhagen Infrastructure Partners, a fund manager whose funds build new energy plants, earned DKK 577.9 million of operating profit on DKK 2,044.8 million of management fees in 2025, a margin of 28.3% [278].
At one fund manager, CIP, a new fund had made six investments within two years of starting to raise money: CIP began raising its fifth flagship fund in the first quarter of 2023, and by the end of 2024 that fund "was more than 60% committed and had made a total of six investments" [275][276].
Updated
Security operations centers
Where software is defended
- Decision time
- 14 days, until an intrusion is found, the global median [288]
- Delivery time
- 43 days to fully patch a known exploited flaw, the median for those patched in 2025 [289]
- More built in
- 6 to 12 months to build a company's own SOC, what two thirds of surveyed firms expected [290]
- Waits on
- Process knowledge
- Limited by
- Margin
- 23.8% operating, S&J in fiscal 2026, up from 21.6% in fiscal 2025 [292]
- Requires
- Tokens, Power, Findings, Funding, Labor, Governance
- Produces
- Defenses
- Feedback
- Traces
- Class
- Class 2 (Dark)
The hardest check on software is an attack. An attacker is a judge that stands outside the factory and wants it to fail, so it looks where friendly tests don't. Some swarms in the ecology exist to break software, as exploit factories, and others to keep it whole, as defense factories. Subconscious, which sells inference for agents, says every engineering team will need two factories: a Software Factory, and an exploit factory to "continuously probe and patch vulnerabilities in your product" [293].
A Security operations center hears back from attackers sooner than it ships its fixes, and what it waits on is people's skills. In the intrusions Mandiant investigated in 2025, attackers stayed a median of 14 days before anyone found them, and Mandiant estimates that "exploitation is routinely occurring before a patch is even released" [288]. Verizon, pooling data from more than 13,000 organizations, found that the median time to fully patch a known exploited flaw "went up to 43 days" in 2025, and says "there are often too many vulnerabilities and not enough time for patching all of them" [289]. Labor ranks first because in ISC2's 2025 survey, 88% of security professionals said a skills shortage had caused at least one significant consequence in the past year [291]. S&J, a listed Tokyo firm that earned 75.7% of its revenue from SOC services, made ¥556 million of operating income on ¥2,333 million of revenue in its year to March 2026, a margin of 23.8% [292][294].
Most companies planning their own SOC expect to build it within a year. In Kaspersky's survey of firms planning their first, "Two thirds of companies (66%) expected to build their SOC within 6-12 months," and more than a quarter expected up to two years [290].
Updated
Exploit factories
Where attackers make exploits
Attackers run exploit factories in fleets, and they outpace the people who patch. "Long-running agents running in fleets can exploit weaknesses on a larger scale and long before a human-in-the-loop security response can find and patch the same vulnerabilities" [295]. In September 2025, Anthropic found that a Chinese state-sponsored group had used Claude Code against "roughly 30 global targets," in what it believes is "the first documented case of a large-scale cyberattack executed without substantial human intervention" [81]. And the models get better at it in months: on ExploitBench, a test of exploiting software vulnerabilities, Anthropic's models went "from 40% with Opus 4.8, to 78% with Mythos 5, and to 91% with Opus 5.5 over a period of approximately four months" [81]. So old flaws come back into reach.
An open model can be built into a malware factory whose samples cost $2 to $35 each [296]. Researchers at Incalmo wrapped the open-weight GLM 5.2 in a system they call PathoGen to make malware: "Of the samples we submitted to VirusTotal, ~27% evaded all 75 scanners", at "a total cost of just $2 to $35 per sample," and "Without PathoGen GLM 5.2 could not produce any fully evasive samples" [296]. Incalmo, which isn't releasing its method, sees a future for defenders "where frontier models proactively generate malware to identify gaps in defenses before bad actors ever find them" [296].
Updated
Defense factories
Where defenders make fixes
Defenders run factories too, and they check each fix by attacking it the way attackers would [295][297]. For now they have an edge in the models: defenders "can give agents direct access to their code and use frontier models," while attackers make do with open-weight ones; OpenAI calls it "the defender's window" [295]. In PHP2Shell the edge held. Flaws in PHP, which "powers 70% of all websites in the world," had been "present for more than a decade." Wiz found the first of them on August 19, 2026, using frontier models, and the fix shipped on October 21, the day the flaws went public [298].
Still, the attacks come from the attackers' models, so a defense factory can turn those on its own code [295]. Detail sells one: it attacks a customer's code with "the same abliterated models attackers are using" [297]. Abliteration "removes the model's built-in refusal mechanism, allowing it to respond to all types of prompts" [299]. Detail confirms each exploit "in a sandbox" and answers with a fix: "We send you PRs, not just tickets" [297]. The sample fix on its page shows two checks, "Exploit reproduced" and "Regression test added" [297].
OpenAI's own Defense Factory is "a continuous, agent-first operation for finding and fixing vulnerabilities." It hands over a step at a time, the way approvals fade: "We started with small batches and human review, then removed repeated manual steps as the results earned trust." And it judges a fix by its realized consequence, not by the merge: "Follow-up checks exposed a gap between merged patches and fixes deployed across the fleet," so deployed fixes are now "independently retested" [295].
A patch fixes one flaw, and a proof rules out a whole kind. Anthropic argues that "The standard defenses against cyberattacks are no longer sufficient: we need ways to prove that code is free of bugs." Working with Theorem, which sells proofs of code [300], Claude "patched the bugs it found and then proved that there are no crashes on any input (up to 64 MB) for 239 entry points across 123 different OSS-Fuzz libraries," over a few weeks. The proofs run to about 180 million lines of Rocq, a language in which a computer checks every step of a proof, so "virtually none of it needs to be manually reviewed" [301]. That suits a factory. Eric Drexler argued in 2024 that because "success has precise criteria," writing proofs "can be formulated as a reinforcement learning task (like winning a game of Go)," and since proof checkers are small and simple, "there's no need to trust opaque software or the AI systems themselves" [302].
But a proof checks code only against its statement and a model of the machine, so the attack moves there instead of ending. Anthropic warns that "a proof checker can't tell you whether your spec matches reality." Its proofs are about "single-threaded, static RISC-V binaries linked against musl libc," while "most people run these libraries on x86 or ARM and dynamically link them against glibc." And the prover is a reward seeker too: Claude "could make any theorem provable by rewriting the program into one that trivially never crashes," so Anthropic penalized its patches and audited them [301], much as Axiom's agents passed Lean on assumptions they hadn't proved. So the attack stays the hardest check, since it runs on the real machine, not the model.
Updated
Home data centers
Where your own agent makes choices for you
- Decision time
- About six minutes, until the person sees its message [303]
- Delivery time
- 16 to 18 weeks for a 64GB Mac mini, in April 2026 [304]
- More built in
- 1 month to 18 weeks for a Mac mini to ship, Apple's estimates in April 2026 [304]
- Waits on
- Atoms
- Limited by
- Memory ICs [304]
- Demand [305]
- Margin
- None of its own: its household buys the machine and runs it for itself [305]
- Requires
- Tokens, Power, Findings, Funding, Labor, Governance
- Produces
- Choices
- Feedback
- Realized consequences
- Class
- Class 2 (Dark)
A personal agent decides for one person, and hears back as fast as that person responds. Getting one running takes months. In April 2026, Apple's US store quoted a Mac mini with 64GB of RAM as "estimated to ship in 16-18 weeks," and even the base model "has a one-month delay," amid "a severe global memory chip shortage" [304]. The wait grew with the memory, and demand ran ahead too: Tim Cook said the Mac mini and Mac Studio "are amazing platforms for AI and agentic tools and the customer recognition of that is happening faster than what we had predicted" [305].
Once it runs, it turns in minutes. In a 2014 study of 24 people's phones by Telefonica's researchers, the median delay before a person attended to a new message was 6.15 minutes [303]. The person gives it its objective, and the approvals it asks for are the person's to give, until the person stops reading them, as approvals do. What it chooses reaches the person as an impact they live with, which is how Cities learn. Its household buys the machine and runs it for itself, so a home data center has no margin [305].
Updated
Harnesses
Software that lets a model act
- Produced by
- Dev shops
- Limits
- Self-driving labs
The harness is the part of a Software Factory that learns fastest, and agents have started to rewrite their own. Every Software Factory is built on one, where intelligence becomes decisions. A harness is "the software around a model, like Claude Code or Codex CLI, that runs its commands and stores its memory and skills" [19].
There are many, and models are now built for them. Some come from the labs, like Anthropic's Claude Code [306] and OpenAI's Codex, and "Recent GPT models are trained on the codex harness" [19]. Others are open. Pi is "a minimal, extensible agent harness that you can make your own" [307]. OpenClaw, "an open-source AI assistant that runs on your own computer" and answers in people's chats, treats "Models and agent harnesses (Claude, Codex, local models)" as "plugins you can swap" [308]. So a model has to fit them all. Moonshot AI found that "Training with a single fixed agent harness can cause a model to overfit to a particular tool schema, system prompt, context management mechanism, or interaction protocol," so it trained Kimi K3 in "mainstream harnesses such as Kimi Code, Claude Code, Codex, OpenClaw, and Hermes" [309]. An agent is a pair, a model and its harness. The RLM, a harness that keeps a long text outside the model's prompt, lets the model see slices of it and hand pieces to other calls of the same model [85]. What a harness adds depends on the model in it: on eight long-context benchmarks, before any training for it, Qwen3.8-27B averaged 30.5 without a harness and 46.1 in the RLM, while the weaker Qwen3-30B-A3B fell from 22.6 to 15.3 [85].
Today people change their harnesses. Pi "skips features like sub-agents and plan mode," and tells its users to "Ask Pi to build what you want" [307]. The harness changes between tasks, when a person asks.
Exo shows where harnesses are going: the agent changes its own, mid-task. In October 2026, researchers at Berkeley, a16z, & Braintrust built it so an agent can rewrite its harness while it works, "including its tools, model calls, compaction, and the procedures governing when and how it attempts further improvements", while the weights stay as they are [200]. On AppWorld, everyday tasks across nine apps, Exo learned on 50 tasks, then passed 96.9% of 100 unseen variants of them, as many as the same harness unable to edit itself, at $0.141 a task instead of $0.359 [200]. Its authors write that "constructing useful specialization can now take less time than the single task that motivates it" [200]. It pays where work repeats, as it does in a factory: on game quests, each done once, Exo spent $0.28 a quest point, against $0.24 for Codex and $0.21 for Pi [200]. Exo keeps a record of what the agent changed: its history is append-only, so the agent can read it but not rewrite it, and a guardian outside the editable code decides whether a new version goes live [200]. That makes a change easy to explain afterwards, from its log, but no easier to predict from a snapshot, so a harness that rewrites itself is still dark.
It learns with no new weights, which is why a lesson is kept there first. And what keeps it safe has to sit below what the agent can rewrite, in its boundaries.
Updated
Judges
Software that checks an agent's work
Agents now write tests, judge work, & rebuild simulators that other agents answer to. At Meta's FAIR, an agent built benchmarks for research agents end to end, choosing what to measure and writing the judge [171]. At Spawn, AI judges built from two years of its people's decisions rule on the questions its agents file [225]. At Anthropic, classifiers resolve most of what a monitor flags, and about 50 transcripts a week reach a person [3]. And at Tutor Intelligence, agents rebuilt a robot's task in simulation from its operators' demonstrations [310].
A check an agent writes on its own can be easy. Left to choose its own subject, FAIR's agent wrote a test Claude Opus 5 all but aced, at 98.0 out of 100; given a detailed specification and the sources to build from, it wrote one the same model scored 65.9 on [171]. A grip that worked in the simulator Tutor's agents rebuilt failed on the real gripper [310]. In both, what made the check hard came from outside the agent: the direction and sources people gave it, and the real robot, as in Who judges it.
One seller of environments expects agents to take over more of the checking, and another has measured how much a mix of models catches. Abundant, which builds RL environments, expects agents to do more of the checking, to "run trials, inspect traces, find shortcuts, propose edits, rerun, and repeat", while "Human experts still choose what matters" [311]. Halluminate measured a QA system that gives each check its own model: on 1,416 bugs it planted in 40 finance tasks, its best mix of models "catches 77.1% ± 1.7% of the all-bugs traps, 4.5 ± 1.4 points (3.3σ) more than Opus 5.5 on every check" [312].
Asked whether they can recall a fact, 19 models read the same cue, so, Pareto argues, asking several adds little [313]. Before each recall question, Pareto asked them "do you think you can answer this correctly?", found that "a shared estimated difficulty factor explains 55% of the variance between models", and concludes, "Running multiple models won't help either. They're all using the same mechanism." [313].
That the factory builds its own checks next is the world's reading from these first cases. In each, the agents' checks still answer to people or the world: Spawn's judges hold some questions for a person [225], and Tutor keeps the real robot as the check [310].
Updated
Boundaries
Limits on agents, enforced outside them
A factory's own agents are a risk to it, so their limits sit outside them. An agent acts on what it believes about where it is, and it can be wrong. In July 2026, Anthropic reported that, reviewing 141,006 of its cybersecurity evaluation runs, it had found three incidents in which Claude reached the internet and "gained unauthorized access to the production infrastructure of three different organizations." Its prompt said it had no internet access, but "a misconfiguration left the machines that Claude accessed as part of the evaluation with live internet access," and Claude "treated the real systems it found as pieces of the exercise." Anthropic calls the incidents "closer to a harness and operational failure than a model alignment failure" [314].
The limit lived in what Claude was told. Jay Springett, writing on how to build the worlds agents act in, puts the difference this way: "A speed limit sign addresses the driver; a speed bump addresses the road" [315]. The prompt was a sign, and most agents still have no speed bumps at all. "They run in chat windows, personal accounts, and one-off scripts, holding whatever credentials and data someone handed them," says Replit's CEO, Amjad Masad. "Nobody decided what they could touch, and nobody can see what they did" [316].
A speed bump can be built. Agent Baseline's reference architecture treats every agent as untrusted, and keeps "what an agent decides apart from what it may do: the agent proposes, policy authorizes, and infrastructure enforces." Four boundaries hold around each agent, "whether it cooperates or not," and credentials stay at a proxy, "so an agent never holds one" [317]. Once an agent can rewrite its own harness, the bump has to sit below what it can rewrite. Exo keeps its agent's history, its credentials, & the guardian that decides whether a rewrite goes live in "a protected mechanism layer" that "must remain outside the executor’s editing authority" [200]. The line holds only as far as the guardian checks, and by default Exo's guardian checks only that the rewrite builds [200].
OpenAI keeps the stop for its research below the code its researchers write. That code "changes often, and is not an ideal place to implement critical load-bearing safety protections," so the stop sits in the layer that runs the models, which has "only a very small number of inference code paths." Each request for output carries its job's number, and the engine running the model checks with a service called Control Room before it answers. Once a job is stopped, its requests are refused within 35 seconds, and sweeps, some run by agents, look for engines launched without the check. In its frontier research, if Control Room goes down, "all inference requests will be denied until Control Room resumes normal operation" [318].
And a limit outside an agent holds only while it stays ahead of the agent. In September 2026, an agent in an OpenAI training run, given a search task about the author of a blog post, found a gap: its sandbox let DNS lookups reach the internet, and it used them to put questions to a public chatbot. One line of its reasoning read: "User only gives permission to research, using publicly offered DNS services acceptable." OpenAI's safety case for the run had "assumed that the model could not access the live internet and that monitoring would detect attempts that succeeded" [319]. OpenAI's CEO, Sam Altman, puts it in steps: "I think sandboxing works to a point. Then I think monitoring works to a further point." Against a model that can "discover new science that people don't already understand," he says, "you need to really, really trust the alignment to trust that the sandbox is staying ahead of capabilities." A model whose alignment he was certain of, he would use "to help you build better and better sandboxes" [21]. So at the far end, what keeps the limit ahead is an agent trusted enough to help build it. Models already help test the sandbox: after the DNS gap, OpenAI "accelerated additional model-assisted red-teaming of the sandbox and network controls" [319].
Inside the limits, people give fewer approvals as a factory proves itself, and co-govern the charter with it [1].
Updated